My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/11/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 05/11/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:36:56 PM
Creation date
5/6/2010 11:47:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # ~, ~~ <br />CONSIDER MUNICIPAL CONSENT FOR THE ANOKA COUNTY INTERSECTION <br />RECONSTRUCTION PROJECT 0206-64, TH 47 AND COUNTY ROAD 27 <br />By: Tim Himmer, City Engineer <br />Background: <br />Anoka County initiated a cooperative agreement with MnDOT to reconstruct the T-intersection at TH 47 and <br />County Road 27 (179`h Lane NW) in the northeast portion of the City back in the fall of 2008. The proposed <br />improvements are being constructed to improve safety along the corridor, and include lowering TH 47 north of <br />the intersection to provide better sight distance, and installing a northbound right turn lane and southbound <br />passing lane. <br />Anoka County is the lead agency and they have met individually with every resident that will be impacted; for <br />both required acquisitions and to educate them on the project. Right-of--way and easement acquisitions are <br />substantially complete, and must be finalized prior to undertaking the project. <br />Observations: <br />Staff has reviewed the plans and addressed some minor concerns related to erosion control, conveyance of <br />runoff, and a detour plan. The project requires municipal consent from the City and once granted by the <br />Council staff will sign the final set of plans, which will then be submitted to MnDOT for approval. It is ' <br />anticipated that final approval will come from MnDOT prior to the end of May, bidding will take place during <br />the month of June, construction will commence at the end of July, and the work will be substantially completed <br />by the end of August. <br />Since it is intended for the intersection to be closed during construction a proposed detour plan is attached for <br />your review. The plan is to temporarily reroute traffic north CSAH 22 along the northern border of the City and <br />then east and west to CSAH 7 and CSAH 5 respectively. <br />Funding: <br />The project is estimated at approximately $270,000; all of which is being funded by MnDOT, with acquisition, <br />design and inspections being performed by Anoka County. <br />Staff Recommendation: <br />Staff recommends that the City Council provide municipal consent for Anoka County project 0206-64, TH 47 <br />and County Road 27 intersection reconstruction, and authorize staff to sign the plans for such. <br />Council Action: <br />Motion to approve municipal consent for Anoka County project 0206-64, TH 47 and County Road 27 <br />intersection reconstruction, and authorize staff to sign the plans for such. <br />Attachments: <br />Location Map <br />Cooperative Agreement Submittal <br />Proposed Improvements <br />Detour Plan <br />Reviewed By: <br />City Administrator <br />Public Works Director <br />CC: 5/11/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.