My WebLink
|
Help
|
About
|
Sign Out
Home
Report Period October 1, 1994 - March 31, 1996
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
LRRWMO
>
Miscellaneous
>
Report Period October 1, 1994 - March 31, 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2010 12:20:26 PM
Creation date
5/10/2010 12:20:26 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOWER RUM RIVER WATER MANAGEMENT ORGANIZATION <br />REPORT PERIOD OCTOBER 1, 1994 THROUGH MARCH 31, 1996 <br />CITY OF RAMSEY <br />Project Name: 153rd/155th Street construction between Variolite Street and <br />Armstrong Blvd. <br />Location: NW 1/4, S 21, T 32 N, R 25 W <br />Project Description Construction of 1.8 miles of roadway adjacent to wetland <br />Project No. 96-1 <br />Engineer/Architect: RLK, Inc. <br />Contractor: Unknown <br />Plan Compliant: NA <br />Project Status/Comments: Construction anticipated 1997. <br />
The URL can be used to link to this page
Your browser does not support the video tag.