My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Improvement Program March 11, 1988
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Airport Improvement Program March 11, 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 3:31:34 PM
Creation date
5/11/2010 11:58:18 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acquisition and Development Costs <br />Preliminary development costs for the acquisition and improve- <br />ment project were developed in the Master Plan Study. The <br />development staging is planned in three phases with Stage I <br />consisting of predominantly land acquisition, grading, runway <br />paving, and lighting and approach aids. Stage II consists of <br />primarily building area improvements and security. Stage III <br />consists predominantly of taxiway and building area improvements <br />to meet increased facility needs. <br />As part of this study, these costs were reviewed since both <br />runway and taxiway widths were increased and several homes were <br />constructed on previously undeveloped lots. The most recent <br />cost estimates are approximately two million dollars higher than <br />the preliminary cost estimates largely reflecting increased <br />value of lands, the acquisition of five additional homes, and <br />relocation cost estimates. <br />Table 2-8 summarizes the development costs for each stage and <br />for the 20 year planning period. These costs are further de- <br />tailed in Appendix D. <br />Stage I <br />Stage II <br />Stage III <br />TABLE 2-8 <br />SUMMARY OF DEVELOPMENT COSTS <br />Development Costs Without Hangars <br />(Rounded to nearest $1000's) <br />Total Project Costs AIP <br />$6,717,000 $6,045,000 <br />697,000 501,000 <br />329.000 268.000 <br />State <br />93,000 <br />21.000 <br />TOTALS $7,743,000 $6,814,000 $114,000 <br />Development Costs with Hangars <br />(Rounded to nearest $1000's) <br />Total Project Costs AIP State Local <br />Stage I $6,717,000 $6,045,000 - 672,000 <br />Stage II 1,248,000 501,000 200,000 546,000 <br />Stage III 742,000 268,000 101,000 373,000 <br />TOTALS $8,707,000 $6,814,000 $301,000 $1,591,000 <br />2-41 <br />Local <br />672,000 <br />102,000 <br />40,000 <br />$814,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.