Laserfiche WebLink
REVIEW FOR ENGINEERING COSTS ON PROJECT 0205-02 <br />************************************************ <br />CITY OF RAMSEY PROJECT: ENGINEERING SERVICES AGREEMENT <br /> Engineering Cost, <br /> Contract, Percent, Funding Rate <br />Engineering Engineering or Not to Exceed Pro rate (PR) <br />Item Work Phase Totat FAA-ST•- MUN <br />**** *****************w****************** *******w********* ***-***- *** <br />1 I•ENVIRONMENTAL ASSESSMENT-SERVICES 27,838.42 000 2/3 1/3 <br />2 !-ENVIRONMENTAL ASSESSMENT-MATERIALS 850.00 000 2/3 1/3 <br />3 I•PREL IM.ENG. REPORT & PREAPPLI CATION 4,733.28 000 2/3 1/3 <br />4 I-PROPERTY SURVEYS-SERVICES 14,238.86 000 2/3 1/3 <br />5 I-PROPERTY SERVICES-MATERIALS 100.00 000 2/3 1/3 <br />6 I•C. R.PELTON ASSOC. SUBCONTRACT 4,325.00 000 2/3 1/3 <br />7 1-FEDERAL-STATE RELOCATION SUB-CONT. 7,500.00 000 2/3 1/3 <br /> TOTAL 59,585.56 <br />June 26, 1987 <br />ESTIMATE NUMBER 1 <br />FAA Project No. NONE <br />PRO RATES USED <br />Engineering Fed: .0000 <br />Costs State: .0000 <br />To Mun: 100.0000 <br />Date <br />*********** <br />.00 <br />.00 <br />.00 <br />.00 <br />.00 <br />.00 <br />.00 <br />0.00 <br />