My WebLink
|
Help
|
About
|
Sign Out
Home
1987 Correspondence
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Correspondence
>
1987 Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 12:54:57 PM
Creation date
5/11/2010 12:53:26 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVIEW FOR ENGINEERING COSTS ON PROJECT 0205-02 <br />************************************************ <br />CITY OF RAMSEY PROJECT: ENGINEERING SERVICES AGREEMENT <br /> Engineering Cost, <br /> Contract, Percent, Funding Rate <br />Engineering Engineering or Not to Exceed Pro rate (PR) <br />Item Work Phase Totat FAA-ST•- MUN <br />**** *****************w****************** *******w********* ***-***- *** <br />1 I•ENVIRONMENTAL ASSESSMENT-SERVICES 27,838.42 000 2/3 1/3 <br />2 !-ENVIRONMENTAL ASSESSMENT-MATERIALS 850.00 000 2/3 1/3 <br />3 I•PREL IM.ENG. REPORT & PREAPPLI CATION 4,733.28 000 2/3 1/3 <br />4 I-PROPERTY SURVEYS-SERVICES 14,238.86 000 2/3 1/3 <br />5 I-PROPERTY SERVICES-MATERIALS 100.00 000 2/3 1/3 <br />6 I•C. R.PELTON ASSOC. SUBCONTRACT 4,325.00 000 2/3 1/3 <br />7 1-FEDERAL-STATE RELOCATION SUB-CONT. 7,500.00 000 2/3 1/3 <br /> TOTAL 59,585.56 <br />June 26, 1987 <br />ESTIMATE NUMBER 1 <br />FAA Project No. NONE <br />PRO RATES USED <br />Engineering Fed: .0000 <br />Costs State: .0000 <br />To Mun: 100.0000 <br />Date <br />*********** <br />.00 <br />.00 <br />.00 <br />.00 <br />.00 <br />.00 <br />.00 <br />0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.