My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Improvements
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Airport Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 1:56:54 PM
Creation date
5/11/2010 1:36:36 PM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2341M) <br />(a) Test procedures are on file in the Department of <br />Transportation Materials Engineering Laboratory <br />in St. Paul. <br />(b) To the extent permitted by these specifications, <br />the Depactment intends to design the mixture <br />with 4 percent air voids. <br />(3) Asphalt cement content, as determined by the <br />trial mix test procedures and above criteria, <br />shall not exceed 6.8 percent nor be less than <br />5.5 percent by total weight of mixture. <br />In the event that 100 percent taconite <br />tailings are supplied the maximum asphalt <br />content permitted shall be 7.5 percent and <br />the maximum air void limit will not apply. <br />(4) The Contractor may elect to use a mixtuce <br />resulting in an asphalt content that exceeds <br />the maximum limit; but, the Contract Agency <br />will deduct the excess design asphalt from <br />the pay quantity for bituminous material for <br />mixture based on the difference between the <br />maximum limit and the higher job-mix asphalt <br />content. The difference will be deducted in <br />all cases, even if the daily average of the <br />bituminous material incorporated into the <br />mixture is below the maximum limit <br />established (as determined by tank stickings, <br />meter readings or observation of batch <br />weights). The normal 0.3 percentage point <br />asphalt content tolecance shall be applied to <br />the amount designated by the Engineer. <br />(5) The requirements for mixture proportions <br />shall be in accordance with 2331.3E; except <br />that, the Job-Mix Formula (J.M.F.) <br />percentages and permissible working range <br />will be established based on the composite <br />aggregate gradation of the approved trial mix <br />~ sample. The working range will be determined <br />by applying plus and minus tolerances to the <br />J.M.F, in accordance with the following: <br />Sieve Size Tolerance 8 <br />3/8 inch + 7 <br />No. 4 + 7 <br />No. 10 + 7 <br />No. 40 + 6 <br />No. 200 + 3 <br />-4- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.