My WebLink
|
Help
|
About
|
Sign Out
Home
Technical Report
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Reports
>
Technical Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 10:49:20 AM
Creation date
5/12/2010 10:39:02 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
624,214 minutes annually, could increase to approximately 5,775,000 minutes by the end of <br />the planning period. Diversion from Minneapolis-St. Paul International could increase the <br />system delay to almost 6,200,000 minutes. <br />.Limitations in existing aircraft storage will also affect the reliever system. Currently, <br />two airports (Airlake and Anoka County-Blaine) aze using approximately 100 percent of <br />their available storage. By the end of the planning period„ all system relievers, with the <br />exception of Crystal Airport, will have an unconstrained demand for aircraft storage in <br />excess of 100 percent of their existing facilities. Storage constraints throughout the reliever <br />system aze illustrated in Erlnbit III-3. Demand for storage in the system as a whole is <br />expected to equal 100 percent of existing storage between 1998 and 2003. This demand is <br />compazed to existing storage and storage expansion in the following chapters. Diversion <br />from Minneapolis-St. Paul could add as many as 16 based aircraft to the reliever system. <br />Table III 7 provides a summary of both operational and aircraft storage capacity at <br />each of the seven relievers at the end of the planning period. This indicates that serious <br />operational and/or storage constraints will continue to develop throughout the system if left <br />unaddressed. <br />4. REGIONAL AIRSPACE OVERVIEW <br />The Minneapolis terminal airspace is approximately 40 nautical miles in radius and <br />is centered on Minneapolis-St. Paul International Airport. The Minneapolis-St. Paul <br />International terminal azea is under the jurisdiction of the FAA's Minneapolis Approach <br />Control facility located at the airport; the airspace and the terminal azea extend from the <br />surface up to and including 10,000 feet. The airspace above 1Q000 feet is under the <br />jurisdiction of the Minneapolis Air Route Traffic Control Center (MSP ARTCC), which is <br />located is Farmington, Minnesota; the ARTCC is responsible for all 1FR traffic in the <br />region. Minneapolis Approach Control provides air traffic control service to all IFR aircraft <br />as well as advisory and separation services to all visual flight rule (VFR) traffic in the <br />.: ~ III-ZO <br />
The URL can be used to link to this page
Your browser does not support the video tag.