My WebLink
|
Help
|
About
|
Sign Out
Home
Technical Report
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Reports
>
Technical Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 10:49:20 AM
Creation date
5/12/2010 10:39:02 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An increase in available capacity at Anoka County-Blaine translates <br />into an increase in the reliever system's capacity. With the number of <br />projected operations remaining constant, the demand for available capacity <br />is reduced to 69 percent in Alternative 3. <br />The projected number of annual operations as a percentage of ASV <br />is presented in Table N 6. <br />3. System Delay <br />By the end of the planning period, the total reliever system delay for <br />Alternative 3 is estimated at two million minutes annually. This level of <br />system delay translates to approximately 1S minutes of delay for each aircraft <br />operation is the system. Average delay per aircraft at Anoka County-Blaine <br />is reduced to 1.8 minutes per operadoa (see Table N-6). <br />4. Preliminary System Cost <br />The cost of building a parallel runway (17R/35L) and taxiway at Anoka <br />County-Blaine Airport was estimated at 51,730,000 in the 1983 master plan.' <br />In 1989 dollars (assuming a 6 percent annual inflation rate), the cost to build <br />• a parallel rumvay and taxiway is estimated at 52,454,000. Construction costs <br />for an FAA tower at Anoka County-Blaine aze estimated at 51,000,000 (not <br />including annual operating costs). Total costs for Alternative 3 aze estimated <br />at 53,454,000 in 1989 dollars. <br />{4) <br />Alternative 4 uses the same assumptions as Alternative 2 regazding the <br />possibility of rumvay and taxiway extensions for Lake Elmo and infra-system <br />diversion. This alternative also assumes that capaaty at Anoka County-Blaine <br />Airport will be enhanced by the addition of a parallel runway and an air traffic <br />control tower. Similar to Alternative 3, improvements at Anoka County-Blaine will <br />increase annual capacity at this airport from as estimated 230,000 to 355,000 annual <br />operations. <br />L-.J <br />' Anoka County -,Blaine Master Plan, 1983, TRA. <br />N-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.