My WebLink
|
Help
|
About
|
Sign Out
Home
Technical Report
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Reports
>
Technical Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 10:49:20 AM
Creation date
5/12/2010 10:39:02 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. CONTINUOUS PLANNING <br />Recommendations and contingencies discussed in previous sections aze graphically <br />summarized in F.:hrbit V-2 As noted, it will be unappazent for some time whether or not <br />certain recommendations that are key to a successful reliever system can be implemented. <br />Additional studies will be required to determine project feasibility, and monitoring of the <br />existing system will be vital to establishing the need to actually implement certain <br />recommendations. The continuous planning element has been divided in two components: <br />follow-on studies and monitoring and tracking efforts. <br />(1) Follow-on Studies <br />Previous sections have eluded to certain follow-on studies that will be required <br />to determine the feasibility of implementing portions of the recommended plan. <br />Follow-on analysis required for the three major components of the recommended . <br />plan is as follows: <br />Pazallel at Anoka County-Blaine Airport <br />To determine the feasibility of this recommendation, the airport's <br />comprehensive development plan will need to be updated. (A <br />comprehensive development plan update is scheduled for 1990.) An <br />environmental assessment for the proposed parallel runway will most <br />likely be required. If proven feasible, follow-on engineering and design <br />studies would be required MAC, as the airport's sponsor, would have <br />primary responsibility for pursuing these studies. MAC and MnDOT <br />efforts, in cooperation with the FAA, will be necessary to provide an <br />ATCT. <br />New Airport in Search Area "A" <br />A site selection study should be undertaken to determine if a <br />technically adequate and acceptable airport site exists in Search Area <br />"A" If a suitable site is found, a master plan and an environmental <br />assessment should follow. Sponsorship of the site selection study may <br />rest with the Metropolitan Council or MAC, or it could be conducted <br />jointly. If a suitable and acceptable site is identified, a sponsor would <br />V-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.