My WebLink
|
Help
|
About
|
Sign Out
Home
Executive Summary
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Reports
>
Executive Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 10:51:51 AM
Creation date
5/12/2010 10:51:51 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The demand/capacity analysis shows the existing reliever system will <br />not be able to efficiently meet future needs without enhancement. Anatysis <br />has shown that deficiencies in airport-spec as well as systemwide <br />annual operating capacity will be experienced unless additional operational <br />capacity is added to the reliever system. The adequacy analysis for the <br />existing system also shows that the existing reliever system could be more <br />effective if: <br />Geographic coverage was increased in the western portion of <br />the metropolitan area <br />The number of relievers with precision instrument approach <br />capabilities was supplemented <br />The number of intermediate airports (runway length greater than <br />5,000 feet) was increased <br />~ ~~~ <br />METROPOLITAN COUNCIL -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.