My WebLink
|
Help
|
About
|
Sign Out
Home
Pre-App Contracts
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Pre-App Contracts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2010 11:34:06 AM
Creation date
5/12/2010 11:32:35 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. <br />EXHIBIT B <br />PHASE I COST BREAKDOWN <br />Direct Personnel Labor Est. Labor <br />Position Exp ense Overhead Rate Hours Expense <br />Principal/Eng. 21.35 26.48 47.83 31 1,482.73 <br />Principal/RLS 21.35 26.48 47.83 78 3,730.74 <br />Proj. Mgr./PL 20.18 25.03 45.21 434 19,621.14 <br />Sr. Draftsman/Tech 13.97 17.33 31.30 85 2,660.50 <br />Jr. Draftsman/Tech 10.96 13.58 24.54 85 2,085.90 <br />Word Processor 10.38 12.86 23.24 148 3,439.52 <br />Survey Tech. 16.30 20.22 36.52 16 584.32 <br />3M Survey Crew 31.70 39.30 71.00 100 7,100.00 <br /> TOTALS: 977 40,704.85 <br />DIRECT PROJECT EXPENSES (HAA): <br />Repro, printing, photos, $850.00 <br />Transp., postage, <br />Deed Descriptions 100.00 <br /> $950.00 <br />Profit at 15$ on labor $6 <br />105.73 <br />Total HAA costs , <br />$47,760.58 <br />Sub-contracts -(Not to Exceed) <br />C.R. Pelton Associates $4,325.00 <br />Federal-State Relocation $7,500.00 <br />Total Sub-contracts $11,825.00 <br />Total Phase I: $59,585.58 <br />Say: $59,585.00 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.