Laserfiche WebLink
AC 150/5100-14A <br />Appendix 1 <br />14- <br />13 <br />12 <br />10 <br />c <br />0 <br />9 <br />E <br />0 <br />V <br />8 <br />7 <br />6 <br />5 <br />4 <br />1111 1 1 1111111 1 1 11 <br />Net construction % from <br />cost Curve 8-1974 <br />9.100,000 9.01 <br />200,000 811 <br />500,000 7.00 <br />1,000,000 6.22 <br />5,000.000 5.32 <br />10,000,000 4.97 <br />50,000.000 4.68 <br />100,000,000 4.61 <br />0.01 0.05 0.1 0.5 1 5 10 50 100 <br />Net construction cost, in millions of dollars <br />FIG. 2, — CURVE B. MEDIAN COMPENSATION FOR BASIC SERVICES EXPRESSED <br />AS A PERCENTAGE OF CONSTRUCTION COST FOR PROJECTS OF AVERAGE <br />COMPLEXITY (1974) <br />FIGURE 2. ASCE MANUAL NO. 45 (1975) <br />4 <br />2/7/85 <br />410 <br />