Laserfiche WebLink
AC 150/5300-4B 6/24/75 <br />67. Aggregate -Turf <br />Figure 12-1. Design Curves <br />CHAPTER 13. OPERATION, MAINTENANCE, AND ADMINISTRATION <br />Page <br />77 <br />78 <br />79 <br />68. Who Will Operate the Airport 79 <br />69. Will the Airport Show a Profit 8o <br />70. Airport Leases 81 <br />71. Airport Regulations 83 <br />72. Airport Accounts 84 <br />73. Available Assistance for Airport Development, <br />Operation, and Maintenance 85 <br />74. What Maintenance is Necessary 86 <br />75. Who Will Perform Maintenance 87 <br />76. What Will Maintenance Cost 87 <br />77. Airport Safety 88 <br />78. Airport Beautification 88 <br />79. Landscaping 89 <br />80. Architecture 90 <br />81. Cleanup Programs 90 <br />CHAPTER 14. CONSTRUCTION PLANS 91 <br />82. General 91 <br />83. Typical Set of Plans 91 <br />APPENDIX 1. VARIABLES IN DESIGN (3 pages) 1 <br />1. Independent Variables 1 <br />2. Statistical Analysis 1 <br />3. Optimum Size Facilities 1 <br />4. Acceptable Variance 1 <br />APPENDIX 2. PRELIMINARY ENGINEERING CHECKLIST FOR <br />FIELD INVESTIGATION (5 pages) <br />APPENDIX 3. WEATHER DATA SOURCE AND ANALYSIS (9 pages) <br />Page iv <br />1 <br />1 <br />1. Procedure 1 <br />2. Wind Rose 2 <br />3. NOAA Functions and Services 3 <br />4. Supplementary Aviation Weather Reporting <br />Stations 4 <br />5. Weather Data Publications 4 <br />Figure 1. Summary of Wind Data 6 <br />Figure 2. Explanation of Format 7 <br />Figure 3. Wind Rose Diagram 8 <br />Figure 4. Azimuth Conversion 9 <br />