My WebLink
|
Help
|
About
|
Sign Out
Home
FAA Regulations
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
FAA Regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 3:58:21 PM
Creation date
5/12/2010 11:45:08 AM
Metadata
Fields
Template:
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/24/75 AC 150/5300-4B <br />lighting system. In many cases, lighting may not be justified <br />initially. Nevertheless, future planning should recognize the need <br />for a lighting system and initial construction should include <br />installation of ducts under pavement for the lighting system. <br />Lighting of obstructions may also be required. <br />h. Utility System. Preliminary design of the utility system includes <br />general layout of the water, sewer, communication, and power <br />systems. In some locations, this will require provisions for <br />on -site water supply and sewage disposal. Local ordinances often <br />dictate design criteria for these facilities. <br />Chap 6 <br />Par 25 <br />Page 27 (and 28) <br />
The URL can be used to link to this page
Your browser does not support the video tag.