Laserfiche WebLink
6/24/75 AC 150/5300-4B <br />lighting system. In many cases, lighting may not be justified <br />initially. Nevertheless, future planning should recognize the need <br />for a lighting system and initial construction should include <br />installation of ducts under pavement for the lighting system. <br />Lighting of obstructions may also be required. <br />h. Utility System. Preliminary design of the utility system includes <br />general layout of the water, sewer, communication, and power <br />systems. In some locations, this will require provisions for <br />on -site water supply and sewage disposal. Local ordinances often <br />dictate design criteria for these facilities. <br />Chap 6 <br />Par 25 <br />Page 27 (and 28) <br />