Laserfiche WebLink
AC 150/5300-4B 6/24/75 <br />Appendix 2 <br />13. Estimated cost for airport construction: <br />Item <br />a. Clearing, on -site <br />antt <br />Acre <br />b. Clearing, off -site Acre <br />c. Obstruction removal <br />d. Unclassified excavation Cu. Yd. <br />e. Borrow Cu. Yd. <br />f. Drainage <br />(a) Pipe <br />(b) Structure <br />(c) Other <br />g. Pavement <br />(a) Airport <br />(b) Road <br />L. Ft. <br />L.S. <br />Sq. Yd. <br />Sq. Yd. <br />h. Turfing Acre <br />i. Lighting <br />(a) Runway, Taxiway, <br />Apron, and Beacon <br />(b) Visual Aids <br />(c) Obstruction <br />j. Utilities <br />(a) Water <br />(b) Sewage <br />(c) Other <br />k. Miscellaneous <br />(a) Fencing <br />(b) Runway marking <br />(c) Segmented Circle <br />and Wind Cone <br />(lighted or un- <br />lighted) <br />1/Lump Sum <br />Page 4 <br />L.S. <br />L.S. <br />L.S. <br />L. Ft. <br />L.S. <br />L.S. <br />Unit <br />Coat Quantity Amount <br />TOTAL: <br />