Laserfiche WebLink
<br />GATEWAY NORTH INDUSTRIAL AIRPORT <br />PROPOSED SCOPE OF SERVICES <br />1. ALTERNATIVE ALIGNMENT - DETAILED EVALUATION <br />2-Man <br />Survey Drafts/ <br />R.L.S. Crew PM Plan Tech W.P. <br />Further Develop Preliminary ALP 12 12 <br />Request for Formal Airspace Review * 1 .5 <br />Topographic Survey** - <br />Obstruction Survey 4 24 - <br />Acquisition Cost Refinement 12 - <br />Appraised/Tax Values of Properties <br />Relocation Expenses <br />Development Cost Refinement 20 4 - <br />Zoning/Land Use Impacts 4 4 - <br />Public Meeting & Preparation 8 6 1 <br />Summary Paper/Recommendation 12 4 <br />8 24 67 26 5.5 <br />*Requires further development of preliminary airport layout plan (12 <br />hrs. PM, 12 hrs. draft) 60-90 day timeframe. <br />**Proposed subcontract for Air Ortho Photo - Ground Control by HAA (RLS <br />4 hrs., 3-MC - 12 hrs., 2MC-8hrs) + subcontract cost. <br />RLS 55 <br />2MSC 65 <br />3MSC 81.65 <br />PM/P1 51.98 <br />Sr. Drafts/T 36.00 <br />Jr. Drafts/T 28.22 <br />WP 26.73 <br />5,181 Min. <br />1,719.80 <br />4,470 <br />11,370.80 <br />5,149 (req'd in any event) <br />$6,221.80 Net cost eval. <br />