Laserfiche WebLink
8.2.14. Construction Impact <br />During the construction of the facilities, several <br />environmental issues arise such as noise, dust, <br />storm water runoff, erosion and pollution. Each of <br />' the issues will be dealt with during the execution <br />of the contract. <br />I <br />L <br />1 <br />1 <br />Noise will not affect the residential area due to <br />the distance from the site approximately 1000 feet. <br />Construction machinery is required by law to have <br />current noise abatement equipment. Dust will be <br />controlled by water sprinkling if necessary. <br />Mitigation of such <br />erosion control can <br />documents. <br />items as sedimentation and <br />be addressed in the contract <br />8.3 Permits Required <br />- Minnesota Department of Natural Resources for alteration <br />of wetland to received storm water runoff and relocation <br />of Country Road 116. . <br />- Pending Shoreland Ordinance, City of Ramsey could require <br />council approval on shoreland adjacent to the wetlands. <br />- Anoka County for relocation of CSAA 116. <br />8 -11 <br />