My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Master Plan October 1985 (2)
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Airport Master Plan October 1985 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2010 9:28:46 AM
Creation date
5/18/2010 9:21:48 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />1 ~ ' <br />P.J,15 Y.~N' <br />D T <br />..., ,r W f <br />1 <br />:t <br />-~ ~ ~ J, <br />c <br />,,~'~~RPOR~g <br />January 4, 1985 <br />~t.i~utiea~a~.~ • Sa~,~ Pam <br />METROPOLITAN AIRPORTS COMMISSION <br />P. O. BO% 11700 TWIN CITY AIRPORT <br />OFFICE OF EXECUTIVE DIRECTOR <br />MINNESOTA 55111 <br />PHONE (612) 726-1892 <br />Mr. John Rutford <br />Referral Coordinator <br />Metro Council <br />300 Metro Square Bldg. <br />St. Paul, MN 55101 <br />RE: Metro Council Referral File No. 12505-1 <br />{ Draft Airport Master Plan <br />Gateway North Ir%iustrial Park Airport <br />Ramsey, Minnesota <br />- Dear Mr. Rutford: <br />MAC Staff have reviewed the information subcni.tted with the subject <br />- Metropolitan Council referral. While the proposed airport develogclent <br />does not relate to a facility wined and operated by the Metropolitan <br />~ Airports Ccumission, we aze interested in and concerned regarding all <br />~ airport develo~nt taking place within the azea of statutory respon- <br />sibility of the Metropolitan Airports Cot~ission. The Metropolitan <br />~ Airports Caemission has reviewed the proposed develoFnlent at Gateway <br />North Industrial Pazk Airport, and is of the opinion that it would not <br />' conflict with any existing MAC facilities. Gateway North Airport is <br />sufficiently re¢oved from the Anoka County-Blaine Airport that there <br />should be no ov+slap betwe^~ operating patterns at the two facilities. <br />! Similarly, Crystal Airport is sufficiently located to the southeast of <br />Gateway North that there should be no interaction between these two <br />facilities. Since the Metropolitan Council is currently up-dating the <br />Aviation Chapter of the Metropolitan Developirent Guide, it would be <br />anticipated that interaction between any proposed facilities developed <br />- as a result of this doc~mlent and Gateway North would be reviewed during <br />System Plan Develogrent. <br />Gateway North Industrial Park Airport can play a significant role in the <br />metropolitan airport system, and we view develognent of the Airport <br />- Master Plan as a significant first-step toward allowing the facility to <br />fulfill its potential role. We would appreciate receiving additional <br />information regazding this develognent proposal as it becomes available. <br />Sincerely yours, <br />Nigel D. Finney \ <br />Director of Planning & E~ineering <br />- /7r <br />OFFICE LOCATION-6040 Y81h AVE. SO.-WEST TERMINAL AREA-MINNEAPOLIS-SAINT PAUL INTERNATIONAL <br />cam: Jeff Hamiel, MPG <br />~'I <br />AIRPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.