My WebLink
|
Help
|
About
|
Sign Out
Home
Steps
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Miscellaneous
>
Steps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2010 9:56:11 AM
Creation date
5/18/2010 9:55:18 AM
Metadata
Fields
Template:
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GATEWAY NORTH INDUSTRIAL AIRPORT <br />ALTERNATIVE RUNWAY ALIGNMENT <br />Background <br />The Airport Master Plan Study evaluated alternative alignments o~ the <br />primary runway and recommended an orientation of 16-34 (160 -340 ) <br />similar to the existing NW/SE runway. After the study was com- <br />pleted,the Prestressed Concrete property became available through <br />bankruptcy. The Council commissioned Hakanson Anderson Associates to <br />explore the feasibility of utilizing the property with a new runway <br />alignment which would lessen the impact on residents to the north of <br />the airfield. <br />Two new alignments were explored and an alignment which shifted the <br />ru~way approximately 700'. south with a southeasterly rotation of <br />13 30' was presented to the Council as the better of the two new <br />alignments using the "Prestress" property. The 15-33 alignment was <br />further compared to the Master Plan alignment through a preliminary <br />assessment. Figure 1 illustrates both runway alignments. The results <br />were presented to the Council last December. The 15-33 alignment was <br />also submitted to FAA for airspace feasibility determination. Their <br />response is attached. No further action has been taken. <br />Results of Preliminary Analysis <br />The preliminary analysis evaluated the advantages and disadvantages of <br />the 16-34 Master Plan alignment and the 15-33 "Prestress" alignment. <br />The following factors were used in the preliminary assessment: <br />Wind coverage <br />Impact on residents and businesses <br />Property acquisition <br />Costs <br />Zoning impacts <br />Wind coverage was essentially the same for both alignments. Under the <br />Master Plan alignment two commercial properties, MacGregor's and Tom <br />Thumb, are recommended to be acquired. Neither of these properties <br />would be acquired under the 15-33 alignment. The Master Plan <br />alignment requires the acquisition of 14 conventional homes to the <br />north. The alternative would require the acquisition of three conven- <br />tional homes to the north. The southward shift and rotation, however, <br />impacts a conventional home and 14 or 15 mobile homes lying outside of <br />the 2,000' clear zone but within Safety Zone A, an area of no <br />development. There is the possibility that these homes may be <br />grandfathered in, however, development restrictions are so severe in <br />Zone A, that it essentially constitutes a "taking". The State's <br />policy has thus been to acquire all developable lands within Zone A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.