Laserfiche WebLink
-114- <br /> <br />The following is a breakdown of the points that were awarded based on ranking of the three <br />companies for each category in the RFP. <br /> <br />1. Charge for towing passenger vehicle *A ton or less. (10 pts possible) <br /> <br /> Collins Brothers received 10 pts. Standard tow 45.00 plus 3.00 per mile towed <br /> Flatbed 65.00 plus 3.00 per mile towed <br /> <br /> North Star received 7 pts. Standard tow. 65.00 plus 2.50 per mile after 4 miles <br /> Flatbed 75.00 plus 2.50 per mile after 4 miles <br /> <br /> Champlin received 7 pts. Standard tow 65.00 <br /> Flatbed 85.00 <br /> <br />2. Charge for towing vehicles ~ ton to 1 ~ ton. (5 pts poss.) <br /> <br />5 <br /> <br />Collins Brothers received 5 pts. <br />North Star received 3pts. <br /> <br />Champlin received 3pts. <br /> <br />65.00 plus 3.00 per mile <br /> <br />Standard tow 75.00 plus 2.50 per mile after 4 miles <br />Flatbed 85.00 plus 2.50 per mile after 4 miles <br /> <br />85.00 <br /> <br />Charge for towing vehicle larger than 1 ½ ton (5 pts. poss.) <br /> <br />North Star received 5pts. <br />Champlin received 3 pts. <br />Collins Brothers received 1 pt. <br />Wench out (5pts poss.) <br /> <br />North Star received 5 pts. <br />Collins Brothers received 3pts. <br />Champlin received 1 pt. <br /> <br />110.00 hr <br /> <br />85.00 plus 3.00 per mile <br /> <br />125.00 hr <br /> <br />35.00 minimum <br /> <br />35.00 plus 2.50 per mile over 5 <br /> <br />2.00 per foot <br /> <br />Hook up or Impound Fee (5 pts. poss.) <br /> <br />Collins Brothers received 5 pts. <br /> <br />Standard tow 45.00 <br />Flatbed 65.00 <br /> <br />North Star received 3 pts. <br />Champlin received 1 pt. <br /> <br />Standard tow 65.00 <br />Flatbed 75.00 <br />Standard tow 65.00 <br />Flatbed 85.00 <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />