My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/22/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 04/22/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:47:52 PM
Creation date
8/29/2003 11:54:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/22/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-:36- <br /> <br />change hands, the Town Center will not be developed and the road cannot be built because the <br />road has to be constructed in the Town Center. <br /> <br />Mayor Gamec noted that the grant amount was $800,000. <br /> <br />Motion by Councilmember Elvig, seconded by Councilmember Cook, to authorize the Mayor <br />and the City Administrator to execute and enter into a LCDA grant agreement with Metropolitan <br />Council for the Sunwood Drive/Town Center project contingent upon the City not spending any <br />money until the City has received free and clear title to the road. easement given to the City. <br /> <br />Further discussion: Councilmember Cook stated that he thought the verbiage of the grant <br />specified that nothing is spent until the City actually has fight of way and begins construction of <br />the road. He was concerned that what was being required as part of the motion is something that <br />can only be addressed in the development agreement. Councilmember Elvig explained that he is <br />willing to accept the grant if he knows that they. are spending the money on the road and not <br />using the funds to buy the easement for the road. City Attorney Goodrich noted that the Met <br />Council will not care much about the two requirements in the motion, they will hold the City to <br />the language in the grant. Councilmember Elvig stated that he thought that they were all moving <br />in the same direction, but he wants to make sure that the City is not going to be burdened with <br />additional costs. City Attorney Goodrich inquired if Mr. Elvig was indicating in his motion that <br />the City can execute the grant and that staff does not specifically need to forward the two <br />conditions to the Met council but make sure that the Council is aware that those other conditions <br />are in place before they spend any money. Councilmember Elvig replied that that ~vas correct. <br /> <br />Motion carried. Voting Yes: Mayor Gamec, and Councilmembers Elvig, Cook, Pearson, <br />Strommen, and Zimmerman. Voting No: None. Abstained: CouncilmemberKurak. <br /> <br />Case #6: <br /> <br />Authorizing the Release of the Draft Town Center Alternative Urban <br />Areawide Review (AUAR) for Comments and Review <br /> <br />Principal Plam~er Trudgeon stated that in January 2003, the City Council authorized the initiation <br />of the Ramsey Town Center Alternative Urban Areawide Review (AUAR) enviro~unental <br />review. The AUAR looks at the environmental impacts of the project and identifies mitigation <br />efforts that need to be undertaken. A draft AUAR document has been prepared for the Town <br />Center project and is now ready for consideration. The City is required to release a Draft AUAR <br />to various state, county, and multi-jurisdictional agencies for review and comrnent, h-t addition, <br />the Draft AUAR document will be available to the general public for their comments. The <br />document is a very large document and is nearly 300 pages long. The base document was created <br />by Ramsey Town Center's consultants. The City has hired three engineering firms to review the <br />document for accuracy and consistency with City policy and goals. There is a 30-day review <br />period (with the possibility of an additional 15 day extension) for everyone to review and <br />cornment on the AUAR document. The City will then have to address the comments and adopt a <br />final AUAR document. From staff and the City Consultant's review, the Draft AUAR generally <br />uses sound analysis for determining the environn~ental impacts and the mitigation efforts <br />described are strong and consistent with City policies. In cases where sections have not been <br /> <br />City Council/April 8, 2003 <br /> Page 8 of 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.