My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/15/2010
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2010
>
Agenda - Public Works Committee - 06/15/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:56:25 AM
Creation date
6/10/2010 3:09:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br />REVIEW FEASIBILITY STUDY IP 10-25 <br />THE BITUMINOUS PAVING OF CHAMELEON STREET <br />IN THE SHAWN ACRES SUBDIVISION <br />By: Steven Jankowski, Assistant City Engineer <br />Background: <br />A petition requesting the bituminous paving of Chameleon Street was received by staff on <br />February 2, 2010 and Council directed the preparation of a feasibility study on February 26, <br />2010. Staff has completed a draft of the feasibility study which is attached to this case. The <br />project scope is similar to that of previous IP 08-31 which you may recall was defeated by <br />petition following a November 10, 2008 public hearing. The project costs have been modified to <br />reflect the current market. One element which has been modified from the original draft is the <br />requirement for paving private drive approach aprons. That policy is being addressed by the <br />Public Works Committee as a separate case. The draft feasibility study has addressed this item to <br />require a minimum of a ten foot apron that will be billed directly to the property owner following <br />its installation. <br />Financial Impact: <br />The cost of this project is estimated to be $305,798 which includes 30% project overhead costs. <br />The Project will be funded as follows: $37,724 from the Storm water Utility; $127,499 in <br />assessment revenue; and $140,575 from the City's general fund which funds 50% of the paving <br />costs and one equivalent share for Shawn Acres Park. <br />Recommendation: <br />Staff recommends approval of the feasibility study for the bituminous paving of Chameleon <br />Street located within the Shawn Acres subdivision and that a public hearing date be set for <br />August 10, 2010. <br />Council Action: <br />Motion to recommend to City Council approval of the feasibility study and recommendation to <br />set the public hearing for August 10, 2010. <br />Reviewed By: <br />Director of Public Works/Principal City Engineer <br />City Engineer <br />Public Works Street Supervisor <br />PW: 06/15/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.