My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 07/08/2010
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2010
>
Agenda - Economic Development Authority - 07/08/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 2:47:31 PM
Creation date
7/1/2010 3:03:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
07/08/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff has investigated the cost of the site. The site is currently bank owned with an asking price of <br />$995,000 for 2.96 acres. This translates into a site cost of $7.72 per. square foot. Additional information <br />regarding the site has been attached. The maximum project size at this location is currently under study. <br />GMI has initially proposed a project size of approximately 10,000 square feet. Public financial <br />participation in this project may require that a larger facility be built in order to generate tax increment <br />revenue of any significance. Further study is needed to make this determination. <br />EDA Action: <br />No action is required by the EDA at this point in time. However, staff would like the EDA to reach a <br />'consensus regarding whether this project should be further investigated for potential public participation <br />and whether this is a desired location for this type of project. <br />Staffwill be providing additional information on this project for your consideration and discussion at the <br />EDA meeting. <br />EDA: 07/08/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.