My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/20/2010
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2010
>
Agenda - Public Works Committee - 07/20/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:57:31 AM
Creation date
7/15/2010 2:58:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
signs in the field would be scheduled for replacement. New test signs would have to be <br />added each year using this method. <br />Staff is recommending using a combination of the expected sign life and blanket replacement for <br />our management method. After our sign inventory is complete we would replace all signs that <br />are known to be older than 12 years old. The blanket replacement would come into play as we <br />replace all signs during an over lay or reconstruction project. Car knock downs would also be <br />factored into the equation. <br />Attached to the case is a draft copy of the proposed sign replacement/maintenance policy for the <br />City of Ramsey. <br />Financial: <br />The cost of sign replacement would be covered through the General Fund Budget under the <br />Traffic Engineering cost center. <br />Action: <br />Motion to recommend to City Council to adopt Sign Maintenance Policy. <br />Reviewed By: <br />Director of Public Works/Principal City Engineer <br />City Engineer <br />PW: 07/20/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.