My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/20/2010
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2010
>
Agenda - Public Works Committee - 07/20/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:57:31 AM
Creation date
7/15/2010 2:58:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Pavement Striping Survey; <br />i. At the beginning of each construction season the Street <br />Supervisor shall review the conditions of city pavement <br />striping. <br />i. All pavement striping needing refreshing will be identified and <br />contract pavement painters will be secured and directed to <br />refresh as needed. <br />ii. City roadways scheduled to be seal coated may be omitted <br />from pavement striping as agreed upon. (Meeting safety <br />standards/requirements) <br />iii. In the event of limited funding, the city will assure that all <br />pavement striping meets standard requirements for retro- <br />reflectivity (and clarity) at a minimum. <br />b. Pavement Striping Paint <br />i. Epoxy paint shall be installed following overlays/new <br />construction. Epoxy typically will not be refreshed prior to first <br />sealcoat most commonly at 5 years. <br />ii. Latex paint will commonly be used following sealcoats. <br />
The URL can be used to link to this page
Your browser does not support the video tag.