My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/09/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 08/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:43:11 PM
Creation date
8/5/2010 3:20:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/09/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # 3 <br /> <br />UPGRADES TO WELL HOUSE #3 EXTERUIR <br />By: John Nelson Utilities Supervisor <br /> <br />Background: <br /> <br />City well #5 was completed in 2000 and well house #3 was constructed to house well #5 in 2001, <br />In 2004 well #6 was constructed on the corner of Zeolite St and Civic Center Drive. Well #6 is <br />piped to well house #3, where the raw water is chemically treated. The interior of this well house <br />was completed as part of the project in 2001; however the exterior was left unfinished. The <br />reasoning behind that decision was to match the exterior to the surrounding buildings when <br />development occurred. The current exterior of the building is unfinished masonry block. With <br />the current additions to the down town area, including the amphitheater, farmers market and the <br />Allina Clinic, staff feels it would be appropriate to start discussing the exterior finish of well <br />house #3. <br /> <br />Funding: <br /> <br />This project was added to the CIP in 2004 and was assigned Capital Improvement Project <br />#04- WTR-005 with a total project cost of $60,000, <br /> <br />Staff Recommendation: <br /> <br />Request for quotes for architectural services for:' <br />. Selecting an exterior design <br />. Adding building security <br />. Removal of propane tank system and pipe natural gas to site <br />. If funding is available, extend road to well house #3 <br /> <br />Committee Action: <br /> <br />Motion to accept/reject staffs recommendation and forward to City Council for approval. <br /> <br />Reviewed By: <br />Director of Public Works/Principal City Engineer <br />City Engineer <br /> <br />PW: 07/20/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.