Laserfiche WebLink
I <br /> <br />I <br /> <br />I <br /> <br />! <br /> <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br /> <br />Preliminary Plat Review: Alpine Acres <br />May 16, 2003, revised June 6, 2003 <br />Page 4 of 6 <br /> <br />be,. ::en this and the former proposed development of seven, from 196 to 203 units. The results <br />of t:. s traffic generation analysis show a 2005 levels of service no lower then "C" for the closest <br />three intersections. These intersection include Alpine Drive and County Road 57, Alpine Drive <br />and CSAH 5 and Alpine Drive and TH47. The lowest acceptable level of service is considered <br />to be )' .vel "E". <br /> <br />Utilities and W'ater Usage: The development will need to be served by municipal water ap.d <br />sanitary sewer. Neither sanitary sewer nor waterrn:.~;~ are immediately availabl~ to the proposed <br />development. The sanitary sewer trunk main currently terminates 880 feet south of the Alpine <br />Drive. The closest locations of the water main are an eight-inch main located on the south side of <br />Alpine Drive and a 12-inch main on the west side of CSAH 5 (Nowthen Blvd.), a distance 300 <br />feet north of 151 st Lane. <br /> <br />It should be anticipated that the City will require that the trunk sanitary sewer line'be extended up <br />~o and through the site to the CSAH 5, and that the 12-inch watermain be extended along CSAH <br />5 up to County Road 57 (Sunfish Lake Blvd.) and then loop through the site and connect with the <br />existing 8~inch water main on the south side of Alpine Drive. <br /> <br />The sewer and water trunk expenditures significantly exceed the revenues associated with this <br />development. This issue will be discussed with the Public Works committee on May 20th. <br /> <br />D~'aina~e and Utility. Easements: The final plat should show all common areas dedicated as <br />drain:.:,"." and utility easements. <br /> <br />Park Dedication: The development was reviewed by the Park and Recreation Commission at <br />their April and May meetings. The Park and Recreation Commission is recommending that park <br />dedication requirements be satisfied through a combination of land dedication and a cash <br />payment. The 2003 Park Dedication rate is $1,800 per unit, which equates to a cash payment of <br />$363,600. The Park and Recreation Commission recommended that the City accept the .5 acre of <br />propos¢:~: open space area located at the southeastern corner of the subject property for land <br />dedication and credit the developer $32,724 towards the required park dedication fees. Therefore, <br />park dedication will consist of a cash payment in the amount of $330,876 and a .5 acre parcel <br />land dedication that will be utilized for public park purposes. It should be noted that the rate in <br />effect at the time the subdivision receives final plat approval will be required. The existing single <br />family homestead is exempt from park dedication requirements. <br /> <br />"rai~ %velop~nent a~tl Trail Fees: The current trail development fee is $475.00Per unit and is <br />due prior :.o reccrding the plat. The rate in effect when the subdivision receives final plat <br />approval will be required. The preliminary plat is providing for an 8-foot bituminous trail along <br />Nowthen Blvd., Alpine Drive, and Sunfish Lake Blvd. The Park and Recreation Commission <br />recommended against providing a trail credit for the construction of pedestrian pathways along <br />the Nowthen Blvd. and Sunfish Lake Blvd. The plat is noting several areas of "proposed trail by <br />others," keeping consistent with past policy, the City has required the developer to construct <br /> <br />-227- <br /> <br /> <br />