Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />! <br /> <br /> FEASIBILITY STUDY <br /> OPTION 1 EXHIBIT D <br /> City of Ramsey <br />Improvement Project No. 02-21 <br />1 51st Ave./Fluorine St. 152nd Ave. <br />Streets,Water Sewer <br /> <br />7/16/2002 <br /> <br />Bid Schedule "C" - Water <br /> <br /> Estimated <br /> Number of <br /> Description Units Unit Unit Price Estimated Cost <br /> 44 Connect to Existing Water Main 2 LS $350.00 $700.00 <br /> 45 ,8" x 8" Tapping Sleeve and Valve EACH $1,200.00 <br /> 46 12" Ductile Iron Pipe CI 52 LF $26.00 <br />' 47 8" Ductile Iron Pipe CI 52 2290 I LF $20.00 $45,800.00 <br /> <br /> 48 6" Ductile Iron Pipe CI 52 90 LF $,18.00 $1,620.00 <br /> 49 Ductile Iron Fittings 2000 LB $1.35 $2,700.00 <br /> 50 12" Butterfly Valve and Box EACH $1,200.00 <br /> 51 8" Gate Valve and Sox 3 EACH $625.00 $1,875.00 <br /> 52 6" Gate Valve and Box 9 EACH . $455.0¢ $4,095.00 <br /> 53 Hydrant 9 EACH $1,650.00 $14,850.00 <br /> 54 Hydrant Extension ... 3 LF .$:;275.00 $825.00 <br /> 55 1" Corporation Tap 26 EACH $82.00 ...$2,132.00 <br /> 56 1" Curb Sox & Stop 26 EACH $84.00 $2,184.00 <br /> <br /> 57 I" Copper Service Pipe ( Open Trench) 780 LF $8.00 $6,240.00 <br /> 58 Salvage and Reinstall I2" Plug EACH $200.00 <br /> 59 Salvage and Reinstall 8" P~ug I EACH $150.00 $150.00 <br /> 8b 2" Insulation 128 SF $1.00 $128.00 <br /> <br />Total - Bid Schedule "C" <br /> <br />$83,299 <br /> <br />IIH~,OllSh~red Ooe. s/munictpat/a~tsego/347/RA633 feasibility-tal=le 1.xls <br /> <br />Page 5 <br /> <br /> <br />