Laserfiche WebLink
I <br />i <br />i <br />I <br /> <br /> FEASIBILITY STUDY <br /> OPTION 2 EXHIBIT D <br /> City of Ramsey <br />Improvement Project No. 02-21 <br />151st Ave./Fluorine St. 152nd Ave. <br />Streets,Water Sewer <br /> <br />7/1612002 <br /> <br />Bid Schedule "C" - Water <br /> <br /> Estimated ~ <br /> Number of <br /> Description Units Unit Unit Price Estimated Cost <br />4,7 Connectto Existing Water ~vlain 2 LS $350,00 $700.00 <br />48 8" x 8" Tapping Sleeve and Valve I EACH $1,200.00 <br />49 12" Ductile Iron Pipe CI 52 LF $26.00 <br />50 8" Ductile iron Pipe CI 52 2290 LF $20.00 $45,800.00 <br />51 6" Ductile Ir0n Pipe CI 52 90 LF $18.00 $1,620.00 <br />52 Ductile Iron Fittings 2000 LB $1.35 $2,700.00 <br />53 12" Butterfly Valve and Box EACH $1,200.00 <br />54 8" Gate Valve and 8o× 3 EACH $625.00 $1,875.00 <br />55 6" Gate Valve and Box 9 EACH $455.00 $4,095.00 <br />56 Hydrant 9 EACH $1,850.00 $14,850.00 <br />57 Hydrant Extension 3 LF $275.00 $825.00 <br />58 1" Corporation Tap 26 EACH $82.00 $2,132.00 <br />59 1" Curb Box & Stop 26 EACH $84.00 $2,.184.00 <br />60 1" Copper Service Pipe ( Open Trench) 780 LF $8.00 $6,240.00 <br />61 Salvage and Reinstall 12" Plug EACH $200.00 <br />62 Salvage and Reinstall 8" Plug 1 EACH $150.00 $150.00 <br />63 2" Insutation 128 SF. $1.00 $,.128.00 <br /> <br />Total - Bid Schedule "C" <br /> <br />$83,299 <br /> <br />IIHaOllShared Oocslrnunicipallaetsegol3471RA633 [easibility-lalule 1.xls <br /> <br />Page 5 <br /> <br /> <br />