My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 06/10/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:49:53 PM
Creation date
8/29/2003 3:22:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shared Construction Cost of Storm Drainage $ 25,580 <br />Plus 33% Overhead <br /> <br />Total Cost of Shared Storm Drainage Construction <br /> <br />Plus Shared Easement Cost <br /> <br />Net Project Cost to be Shared <br /> <br />25% Share Allocated to Helium St. Properties for Right-of- <br />Way Negotiations <br /> <br />$ 8,441 <br />$ 34,021 <br /> <br />$ 4,000 <br /> <br />Water and Sanitary Sewer <br /> <br />The current hookup fees for water and sanitary/sewer are as stated in the City's <br />Schedule of rates and Charges. For .water hookup, the lateral charge is $ 3,118 <br />and the trunk fee is $ 562. For sewer hookup, the lateral charge !s <br />$ 6,939 the trunk fee is $1,252. The total lateral gharge'for water and sewer is $ <br />10,057. The current eight residences would generate $ 80,456. However, if <br />each of the eight groups of three lots would s. plit into bvo lots, then the sixteen <br />hookups would generate $ 160,912. This would more than cover the expected <br />cost shown below. <br /> <br />Construction Cost of Water $ . 65,046 <br />Plus 33% Overhead $ 21,465 <br />Total Water Project Cost $ 86,511 <br /> <br />Construction Cost of Sanitary Sewer $ 48,653 <br />Plus 33% Overhead $ 16,055 <br />Total Sanitary Sewer Project Cost $ 64,708 <br /> <br />Total Cost of Water and Sewer $151,219 <br /> <br />8.0 <br /> <br />PROJECTED PRO~IECT SCHEDULE <br /> <br />If the City should elect to proceed with the improvements, the following schedule <br />could be anticipated': <br /> <br />1) Present feasibility study and set date of public July 23, 2002 <br /> hearing <br /> Hold public hearing <br /> Order plans and specifications (Following 60 day <br /> waiting period) <br /> Pass condemnation resolution <br /> <br /> Approve plans and specifications and authorize <br /> bids <br /> <br />2) <br /> <br />3) <br /> <br />4) <br /> <br />5) <br /> <br />.A__u,qust 13, 2002 <br />October 22; 2002 <br /> <br />October 22, 2002 <br /> <br />December 17, 2002 <br /> <br />Page 7 <br />G:~vlunicipal~ARAMS ~Y\632\RA632FSR.doc <br /> <br /> I! <br /> <br />! <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I' <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br />,I <br /> I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.