My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 06/10/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:49:53 PM
Creation date
8/29/2003 3:22:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY STUDY <br /> EXHIBIT D <br />City of Ramsey Improvement Project <br /> Helium Sl:reet Extension <br /> Streets,Water Sewer <br /> <br />No. 02-20 <br /> <br />7/18/02 <br /> <br />I <br />I <br />I <br /> <br />Bid Schedule "C" - Watermain <br /> <br />NO. <br /> <br />Oescriution <br /> <br />Estimated <br />Number of <br />Units <br /> <br />24 ]Cut In 12"x 12" Cross 1 <br />25 '8" x 8" Tapoing Sleeve and Valve <br />26 12" Ductile Iron Pipe CI 52 <br /> 1800 <br /> <br />Ductile Iron Pipe CI 52 <br /> <br />16" Ouctile.tron Pipe CI 52 <br /> <br />27 <br />28 <br /> <br />29 Ouctile Iron Fittings <br /> <br />30 I2" BL~tte~'~y Valve and 8ox <br /> <br />3I !8" Ga(e Valve and Sox <br /> <br />7O <br /> <br />32 6" Gate Valve and Box <br />33 [:Hydrant <br /> <br />1000 <br /> <br /> 7 <br /> 7 <br />34 Hydrant Extension 4 <br />35 II" Corporation Tap 40 <br />36 1" Curb Box & Stop 40 <br />37 fi" Copper Service Pioe( Open Trench) 1200 <br /> <br />38 ISaivage and Reins(all !2" Plug. <br />39 Satvage and Reinstall 8" Plug <br /> <br />40 2' Insulation <br /> <br />128 <br /> <br />Unit <br /> <br />Unit Price <br /> <br /> .sI <br />EACH <br /> <br /> LP <br /> <br />EACH <br />~ACH .. <br />EACH <br />EACH <br /> LF <br />EACH I <br />EACH I <br /> LF- <br />EACH J <br />EACH ] <br /> <br />Estimated Cost <br /> <br />$1,500.001 $1,500.00 <br />$1,200.0b <br />$28.00 <br />$26.00 $41,600.00 <br />$24.00 $1,680.00 <br />$1.35 $t,350.00 <br />$1,200.00 <br />$825.00 $3,125.00 <br />$455.00 $3,185.00 <br />$t,650.00 $11,550.00 <br />$275.00 $1',100.00 <br />$82.00 $3,280.00 <br />$84.00 $3,360.00 <br />$8.00 $9,600.00 <br />$200.00 <br />$150.00 <br /> <br />$1.00 <br /> <br />$128.00 <br /> <br /> I <br /> I <br /> I <br />'1 <br /> I <br /> <br />Tote[ - Bid Schedule "C" <br /> <br /> Page 4 <br />//Ha011Shared Oocslmunicipal/aotsegot3~7/RA3168 feasibility-~able 1 .xls <br /> <br />$81,458 <br /> <br />7/18/02 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.