Laserfiche WebLink
Background: <br />At the July Public Works Committee meeting staff was asked to acquire quotes for the <br />improvement of the unfinished exterior of the well house and removal of the 1000 gallon <br />propane tank and to hook up natural gas to the site. <br />Staff Recommendations: <br />UPDATE FOR WELL HOUSE #3 EXTERIOR <br />By: John Nelson, Utilities Supervisor <br />CASE # <br />Findings: <br />Two quotes for siding the exterior of the building were $9,450 for standard vinyl siding and <br />$11,650 for a prefinished cement board. Quotes for an exterior paint to cover the 1,584 sq. foot <br />exterior ranged from $168 to $200, the labor could be handled internally. <br />CenterPoint Energy quoted a price of $6,200 to run the needed 300' of natural gas line to the site. <br />This price is good until October 1 after that frost charges will be added. Contact has been <br />made with a company that will upgrade the emergency generator at this site and more <br />information on this topic will be available at the meeting. <br />Quotes for security upgrades for this site have been received from two contractors that equal <br />$2,200 and this upgrade utilizes our existing SCADA system and will not need an additional <br />monthly phone /security company charge. <br />Staff recommends painting the building's exterior utilizing Public Works personal, removing the <br />propane system, adding a natural gas supply, upgrade heaters, generator and adding security <br />measures to this site. <br />Funding: <br />These upgrades would be funded by the Water Utility Capitol Improvement Project #4 -WTR- <br />005. <br />Committee Action: <br />Based upon discussion. <br />PW: 09/21/10 <br />