Laserfiche WebLink
REeD SEP 14 2010 <br />PARTIAL PAY ESTIMATE NO.2 <br />Date: September 7, 2010 <br />Project: IP 08 -33 Ute Street Improvements <br />Contractor: Rum River Contracting Inc. <br />Contract Amount: $138,700.01 <br />Award Date: April 28, 2010 <br />The following work has been completed on the above referenced project: <br />Bid <br />QntY <br />Item <br />Qnty <br />Unit <br />Unit Cost <br />to Date <br />1 <br />Mobilization <br />1 <br />is <br />$5,500.00 <br />1 <br />2 <br />Traffic Control <br />1 <br />is <br />$1,000.00 <br />1 <br />3 <br />Grading <br />11 <br />sta <br />$200.00 <br />11 <br />4 <br />Silt Fence <br />300 <br />ft <br />$1.30 <br />300 <br />5 <br />Construction Fence <br />$00 <br />ft <br />$2.00 <br />6 <br />Salvage Chain Link Fence <br />90 <br />ft <br />$5.00 <br />125 <br />7 <br />Remove and grub trees <br />20 <br />ea <br />$101.00 <br />28 <br />8 <br />Salvage topsoil <br />7300 <br />sgyd <br />$0.30 <br />7300 <br />9 <br />Modified Class 5 <br />547 <br />tons <br />$13.00 <br />623.97 <br />10 <br />Bit LV Nonwear Course <br />264 <br />tons <br />$58.95 <br />250.88 <br />=11 <br />Bit LV Wear Course <br />239 <br />tons <br />$69.60 <br />12 <br />Bit Tack <br />156 <br />gal <br />$3.00 <br />13 <br />2X3 Catch basins <br />2 <br />ea <br />$645.85 <br />2 <br />14 <br />48" Stormwater MH <br />44 <br />vft <br />$188.71 <br />44 <br />15 <br />84" Sump Storm MH <br />1 <br />ea <br />$5,724.96 <br />1 <br />16 <br />Storm castings <br />10 <br />ea <br />$432.22 <br />10 <br />17 <br />12" RCP <br />93 <br />ft <br />$19.33. <br />93 <br />18 <br />15" RCP <br />584 <br />ft <br />$23.55 <br />585 <br />19 <br />18" RCP <br />580 <br />it <br />$28.20 <br />572 <br />20 <br />12" RCP FES w /guard <br />2 <br />ea <br />$442.91 <br />2 <br />21 <br />15" RCP FES w /guard <br />2 <br />ea <br />$919.08 <br />2 <br />22 <br />18" RCP FES w /guard <br />1 <br />ea <br />$541.32 <br />1 <br />23 <br />Rip Rap Class 3 w /fabric <br />8.9 <br />cy <br />$85.00 <br />8.9 <br />24 <br />Topsoil borrow <br />150 ' <br />cy <br />$9.00 <br />25 <br />Export surplus spoil <br />500 <br />cy <br />$1.00 <br />156 <br />26 <br />Sod with fertilizer <br />3520 <br />sq yd <br />$2.40 <br />27 <br />Fertilizer, seed & mulch <br />0.2 <br />acre <br />$4,500.00 <br />28 <br />Protect Irrigation Systems <br />1 <br />ea <br />$500.00 <br />29 <br />Bit Driveway Restoration <br />250 <br />sq ft <br />$2.50 <br />30 <br />Conc Driveway Restoration <br />70 <br />sq ft <br />$8.00 <br />31 <br />Replace Chain Link Fence <br />55 <br />ft <br />$10.00 <br />Extension <br />$5,500.00 <br />$1,000.00 <br />$2,200.00 <br />$390.00 <br />$0.00 <br />$625.00 <br />$2,828.00 <br />$2,190.00 <br />$8,111.61 <br />$14,789.38 <br />$0.00 <br />$0.00 <br />$1,291.70 <br />$8,303.24 <br />$5,724.96 <br />$4,322.20 <br />$1,797.69 <br />$13,776.75 <br />$16,130.40 <br />$885.82 <br />$1,838.16 <br />$541.32 <br />$756.50 <br />.$0.00 <br />$156.00 <br />$0.60 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />