My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/28/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 09/28/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:46:09 PM
Creation date
9/23/2010 10:46:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/28/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # b Oy <br />PUBLIC HEARING ON IP 08 -33 UTE STREET IMPROVEMENTS <br />By: Steven Jankowski, Assistant City Engineer <br />Background: <br />This project consists of the grading and paving of Ute Street north of 179 Lane. The project <br />also included the installation of storm sewer and water treatment before discharging to Rogers <br />Lake. Project costs are to be divided among three funding sources which.include: the city general <br />fund; the storm water utility; and special assessments to nine benefrtted properties. The assessed <br />portion of the costs are to be collected over a ten year period as specified in the project <br />feasibility study. — <br />At the time of this writing all project elements have been completed except for the final turf <br />restoration which is expected to take place prior to the assessment public hearing. These costs <br />have been estimated in determining the final project costs. <br />Financing: <br />A comparison of the final project costs and their distribution among funding sources compared <br />with those estimated in the feasibility study is as follows: <br />City General Fund <br />Property Assessments <br />Storm Water Utility <br />TOTAL <br />Per share assessment* <br />Feasibility <br />Final <br />Study <br />Project <br />Estimate <br />Costs <br />$ 59,391 <br />$ <br />56,889 <br />$ 59,391 <br />$ <br />56,889 <br />$ 90,064 <br />$ <br />81,917 <br />$ 208,846 <br />$ <br />195,695 <br />$ 6,599 <br />$ <br />6,321 <br />* Four properties will receive half shares. <br />Recommendation: <br />Following the close of the Public Hearing adopt the attached resolution 10 -09 -XXX levying a special <br />assessment for Improvement Projects #08 -33, Ute Street Improvements. <br />Action: <br />Motion to adopt Resolution 10 -09 -XXX levying a special assessment for Improvement Projects #08 -33, <br />Ute Street Improvements. <br />t <br />Reviewed By: <br />City Administrator <br />Director of Public Works/Principal City Engineer <br />City Engineer <br />Finance Director <br />CC: 09/28/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.