My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/28/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 09/28/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:46:09 PM
Creation date
9/23/2010 10:46:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/28/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposes 149 parking spaces: 138 off - street and 11 on- street. Twenty -five of the off - street <br />spaces would be gbsorbed by a future structured parking facility planned on the proposed COR <br />Master Plan. As noted previously, areas of future shared parking shall be encumbered by a <br />separate, recordable shared- access easement. <br />Landscape and Civil Engineering plans are generally acceptable with changes outlined in the <br />Staff Review Letter. <br />Funding: <br />All costs associated with reviewing the application are the responsibility of the Applicant. <br />Recommendation: <br />The Planning Commission met on September 16`" to review the preliminary site plan and <br />recommended City Council approve the site plan, contingent upon the City Staff Review Letter <br />dated September 9, 2010, which included revising the footprint of the proposed building in order <br />to meet setback requirements. <br />Commission Action: <br />Motion to the preliminary site plan contingent upon compliance with the City Staff Review <br />Letter dated September 9, 2010, revised September 22, 2010, including revising the footprint of <br />the proposed building in order to meet setback requirements. <br />Review Checklist: <br />Planning Manager <br />City Engineer <br />Environmental Coordinator i J <br />CC: <br />Attachments: <br />a. Site location map <br />b. Sketch Plan <br />C. Site Plan <br />d. Shared Access and Parking Exhibit <br />e. City Staff Review Letter dated September 9, 2010, revised September 22, 2010 <br />f. DRAFT Development Permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.