GENERAL PROJECT INFORMATION:
<br />RESPONSIBLE PARTIES:
<br />The Contractor and Owner must apply for ewaroga under the MPCA's General Storm Water Permit far
<br />Construction Activity as required by the National Pollutant Discharge Elimination System (NPOES) Phase II
<br />program. Coverage under the penult will begin automatically 7 calendar days after the po.tmmkad data
<br />on the permit application. [Langer time frame, apply to sites mat: (1) dieturb areas greater than 50
<br />es ANO discharge within 1 mile of a Special or Impaired Water, or (2) Us, alterative storm water
<br />treatment techniques].
<br />RECEIVING WATERS:
<br />Surface water. which will receive atom water from the site within 1 mile of project boundary. Include
<br />waters shown an USCS 7.5 minute quad and all waters identified in Appendix A of the permit.
<br />Name of Water Bad
<br />Type (ditch,
<br />pond, wetland,
<br />lake, etc. )
<br />Appendix A
<br />5 ecial Water!
<br />Flows la
<br />Impaired Water
<br />within 1 mile?
<br />USEPA
<br />Approved
<br />TMDL7
<br />Mi.ele.i River
<br />River
<br />YES
<br />NO
<br />NO
<br />Designed Oiacharge for Water Quality Volume:
<br />Areas not to be disturbed shall be delineated with flags. stakes, signs silt fence, etc. prior to work
<br />Required Infiltration Volume:
<br />Contact Person
<br />Phone
<br />Impairment:
<br />Owner: PSD, LLC5200 MATT KUKER 763.427.5995
<br />Contact Person Phone CONSTRUCTION ACTMTY NOTES:
<br />SWPPP Pro mar. BOLTON & MENK, INC
<br />ADAM NAFSTAD
<br />753.433.2851
<br />EROSION PREVENRDN PRACTICES:
<br />Elevation of Water Quality Volume Slamge:
<br />Contact Person
<br />Phone
<br />Phaxd construction will be used to extent practical or as indicated in the plans to minimize exposed sails.
<br />Contractor.
<br />N A
<br />Designed Oiacharge for Water Quality Volume:
<br />Areas not to be disturbed shall be delineated with flags. stakes, signs silt fence, etc. prior to work
<br />Required Infiltration Volume:
<br />Contact Person
<br />Phone
<br />beginning. The normal wetted pan star of all ditches or .wales, including storm water management pond
<br />Person Responsible
<br />slope., that drain waters from the H. must be stabilized within 200' of any property edge or discharge
<br />For Inepecllons:
<br />point including storm sewer inlets, within 24 hours of connection.
<br />Contact Pman
<br />Phone
<br />Party Responsible far
<br />Energy dissipation or other outlet treatment must be Installed within 24 hours of connection.
<br />Long Tenn O&M of
<br />Permanent Storm Water
<br />All axpoved soils must be stabilized as soon ae possible but o no ease ,tar than 14 days attar the
<br />Management FacllilY
<br />construction octhiily has temporarily or permanently c ...d.
<br />Contact Pman
<br />Phone
<br />Seed and /or mail, fertilizer, and mulch .hull be placed am indicated In the plane and project specifications.
<br />Count ,Stale I Townshi Ran a Sections tolitude Lan itude Rapid stabilization shall be of type and quantity indicated in the pmject specification,. Additional
<br />Anoka. MIN 32 25 26 45.2315 — 93.4568 rapid stabilization may be necessary to minimize erosion throughout the duration of the project. Type
<br />and quantity shall be determined by the engineer —inspector prior to installation.
<br />PRQJFCr DESCRIPTION:
<br />This project includes disturbance of approximately 2.4 acres. Construction activities include water main. If the Contractor dockpiles material on site, he shall install the appropriate Ion control device,
<br />sanitary sew r. storm sewer, bituminous parking, proposed building, and landscaping• around the stockpile and perform the beat management practice. possible to avoid erosion from the
<br />stockpile.
<br />Sails on the wile ore primarily of Hydrologic Sail Group Type A. with high infiltration capacity.
<br />Planned Construction Start Date: 10/1/2010
<br />Estimated Construction Campl.Uon Data: 10 1 T011
<br />PROJECT ARM
<br />Total Project Size (disturbed area) m 2.35 AC
<br />Existing area of impervious surface — 0 AC
<br />Post construction area of Impervious surface — 1.9 AC
<br />Total new Impervious surface area created — 169 AC
<br />SrOR n Ws TF
<br />Type / Loan =Mno used If more than 1 oero of now Impervious surface Is created:
<br />Wet sedimentation boa!" Regional PermanenRegional pond=% Alternative methods=
<br />Infltrolfan t storm water
<br />Filtration management not required=
<br />Required Water Quality Volume:
<br />N A
<br />Design Water Ouafily Volume:
<br />N A
<br />Elevation of Water Quality Volume Slamge:
<br />N A
<br />Surface Area at Water Quality Volume Storage:
<br />N A
<br />Allowabla Oixharga of Water Quality Volume:
<br />N A
<br />Designed Oiacharge for Water Quality Volume:
<br />N A
<br />Required Infiltration Volume:
<br />N A
<br />Designed Infiltration Volume:
<br />N A
<br />Temporary (or permanent) sedimentation pond, are required for area, > 10 acres of disturbed soils
<br />draining mails draining to one paint.
<br />SEDIMENT CONTROL PRACTICES:
<br />Inalallation e/ sill
<br />(once and all other down gradient sediment protection measures shall be completed
<br />prior to commencement of upstream land disturbing activities.
<br />STIR fence shag be installed along constant contaunr with continuo.. lengths not to .....d 600 fact.
<br />Am Indicated on plans silt fence will be periodically broken and hooked upalope in 'J —hook" or smile
<br />patterns to provide pondinq and slow runoff.
<br />No unbroken slope lengths greater than 75 feet v e permitted when elope fa 3:1 or greater. Slope shall
<br />be broken with set fence or Marotta as indicated on plane.
<br />Install ditch check. (8(arolla) v a shown in plan. Ditch checks to be Installed after street Is removed and
<br />left In place until Mal restoration is established.
<br />BMP
<br />QUANTITY
<br />INLET PROTECTION
<br />11 EA
<br />SILT FENCE
<br />1350 LF
<br />ROCK CONSTRUCTION ENTRANCE
<br />1 EA
<br />Due to the size of the disturbance and the total amount of now impervious area, this site requires
<br />permanent storm water troobnenl. A regional detention basin downstream has been sized
<br />by the City of Ramsey to handle dwelopment in this area. and the Owner has obtained psrrnission
<br />to discharge into the regional basin.
<br />E,Isting discharge patterns or maintained in the proposed condition. The parking lot lands to
<br />drain from wool to Baal. In the southeast comer of the site, the proposed 24' mainline storm sewer
<br />will discharge Into the 27' city maintained storm mewer system. From there, an 88' concrete arch
<br />pipe discharges alarm water runoff to the regional basin.
<br />Vehicle backing to be minimized to all practical e.lant.. All eroded material that leave, the construction
<br />zone shall be collected by the contractor and returned to the site at the contractors expense.
<br />NI stock piles shall be surrounded by sill fence and seeded with temporary seed and mulch. See erosion
<br />and sediment control plans.
<br />All dewalering an site during construction must be muted to temporary sedimentation basins.
<br />Temporary sedimentation basins must be drained within 48 hours of any rainfall event. If the rock
<br />filtered outlets plug or .e the pond not to drain within 48 hours. ponds am to be drained with pumps.
<br />Pump inlet. should be protected with a geotextile membrane and rock filter setup as shown In the details,
<br />approved alterative. Excessive sediment —laden water that Is not properly filtered will not be
<br />Permitted to discharge from Bile.
<br />Dewolering practices cannot cause downstream nuisance conditions erosion or non — permitted wetland
<br />inundation causing adverse impact..
<br />All solid w PREVENTION:
<br />All solid wools collected from the construction site must be disposed of in accordance with MPCA disposal
<br />requirements.
<br />Concrete washout must be contained in device such as provided by Neotan Brothers Concrete Washout LLC,
<br />or equivalent unit Unit must be maintained to manufacturer rocommendollar.
<br />All hazardous material, (e.g., oil. gasoline, fuel. antifreeze, paint, cleaning .,[vents curb" compounds,
<br />ferlillzers• etc.) must be properly stored (Including secondary containment when nma eaary) to prevent spills.
<br />looks or other discharge. Storage and disposal of hazardous waste must be in compliance with MPCA
<br />regulations.
<br />External washing areas must be limited to a defined area of the ails. All runoff containing any hazardous
<br />material must be properly collected and disposed of. Defined ar must be contained with heavy— or
<br />super —duly milt fence. NO ENGINE DECREASING ALLOWED ON SITE.
<br />The contractor is responsible for monitoring air pollution and ensuring it does not exceed level. at by
<br />local, stale or federal regulations. This includes dust created by work being performed on the wile. Air
<br />pollution and dust control correction le considered incidental to the unit bid prices for which work is
<br />being performed. Additional dual control measures may be required by the Engineer.
<br />INSP CTIDN h tl � RM -
<br />The per.1th"e must routinely Inspect the construction site once every seven (7) days during active
<br />c,netrucilon and within 24 hours of a rainfall event greater than 0.5 inches In a 24 hour period.
<br />All inspections performed during construction must be recorded and records retained an site with the
<br />SWPPP in o cordance with the storm water permit. Record, must include a site map showing areas of
<br />land disturbing aativl8es and area. where a,U,iti,s have temporarily or permanently ceased.
<br />Sill fence, biorol[s and inlet protection devices must be maintained when non — functional or when
<br />accumulated sediment reaches 1/3 of device height.
<br />Off ails vehicle tracking to be removed within 24 hours of occurrence.
<br />All non — functional BMPs must be repaired, replaced, or supplemented with functional BMP. within 24 hours
<br />of discovery, or as own as field condition, allow access.
<br />FINAL - R �ARILIZATION
<br />The permitlee, must submit a Notice of Termination (N.O.T.) within 30 days of Mal .tablizall— or
<br />transferring permit responsibility to another owner or operator.
<br />The Contractor must ensure final stabilization of the site. Final stabilization shall include o minimum of
<br />70,5 vegetation establishment (1DOR stabilized) on all pervious areas.
<br />All temporary erosion control m ... u and BMPs must be removed as part . of the final mite Mobilization.
<br />unless directed otherwise by owner or engineer.
<br />IMPLEMENTATION SCHEDULE k PHASING
<br />1) Install Inlet Protection.
<br />2) Install rock construction entrances arW temporary rock check dame.
<br />3) In.toll .ubdmin pipe (remove and reinstall check dams as necessary).
<br />4) bntall bituminous pavement.
<br />5) Inalall slrlping.
<br />6) Remove inlet protection.
<br />7) Add additional temporary Blips ae eaary during construction based on Inspection report..
<br />8) Ensure M e
<br />al stabilization mea re are complete. -
<br />9) Submit Notice of Termination (NOT) to MPCA within 30 days of final atabili-t1w.
<br />All efts storm sewer Inlets, as wall as off site downstream inlets with potential to receive sediment shall RECORD RETENTION:
<br />be protected with approved inlet protection measure s at all times. Inlet, shall remain protected until The SWPPP, all changes to It. and Inspections and maintenance records must be kept at the site during
<br />site Is IGOK stabilized and vegetation Is at Iext 70K established. Inlet protection may be removed in actructian. All owners) must retain the following for 3 years after submittal of NOT:
<br />winter, It the project has an approval letter from Jurisdictional authority or can produce it within 72 hours. 1) SWPPP;
<br />2) Any other permits required for the project;
<br />TEMPOR rry SEDIMENTATION BASINS tr DEWATERING 3) Inspection and maintenance logo;
<br />Temporary sedlmanlalion basins a required prior to runoff leaving the construction site o entering surface 4) NI permanent operation and maintenance agreements for surface water facilities;
<br />wal when 10 or r soil s of disturbed . drain to a • on location. The basin provide 5) NI design calculations for temporary and permanent for
<br />e. water management.
<br />3,800 cubic feet of storage below the outlet per acre drained. If hydraulic calculations am available, the
<br />temporary sedimentation basin must provide a storage volume equivalent to the 2 —year, 24 —hour storm, PLAN SHEETS:
<br />but in no came less than 1800 cubic feat per acre drained. The temporary sedimentation basin must be Sheet numbers C3. C4, C5, CO & CB of this plan set are also considered a part of the SWPPP for this
<br />constructed and made operational concurrent Wth the start of soil distrubonce upgradlent of the pond. project.
<br />° wdro . m°i a<wrmxm"wr,m'r'rwmaA°m T BOLTON 8. MENK, INC.
<br />Consulting Engineers k Surveyors RAMSEY TOWN CENTER 12TH ADDITION rSA
<br />PSOr LLC ADAM NAF6TA0. PE uxwxxM. MN MRM W MN SLEEP'r EYE MN WLUUx. MN STORM WATER POLLUTION PREVENTION PL4N
<br />, tea M259 um a/i1/2.1. 9aM.LLL MN CH Asm MN pousu. MN MANUMNaCV. NN .WTI N NARRATIVE