Laserfiche WebLink
GENERAL PROJECT INFORMATION: <br />RESPONSIBLE PARTIES: <br />The Contractor and Owner must apply for ewaroga under the MPCA's General Storm Water Permit far <br />Construction Activity as required by the National Pollutant Discharge Elimination System (NPOES) Phase II <br />program. Coverage under the penult will begin automatically 7 calendar days after the po.tmmkad data <br />on the permit application. [Langer time frame, apply to sites mat: (1) dieturb areas greater than 50 <br />es ANO discharge within 1 mile of a Special or Impaired Water, or (2) Us, alterative storm water <br />treatment techniques]. <br />RECEIVING WATERS: <br />Surface water. which will receive atom water from the site within 1 mile of project boundary. Include <br />waters shown an USCS 7.5 minute quad and all waters identified in Appendix A of the permit. <br />Name of Water Bad <br />Type (ditch, <br />pond, wetland, <br />lake, etc. ) <br />Appendix A <br />5 ecial Water! <br />Flows la <br />Impaired Water <br />within 1 mile? <br />USEPA <br />Approved <br />TMDL7 <br />Mi.ele.i River <br />River <br />YES <br />NO <br />NO <br />Designed Oiacharge for Water Quality Volume: <br />Areas not to be disturbed shall be delineated with flags. stakes, signs silt fence, etc. prior to work <br />Required Infiltration Volume: <br />Contact Person <br />Phone <br />Impairment: <br />Owner: PSD, LLC5200 MATT KUKER 763.427.5995 <br />Contact Person Phone CONSTRUCTION ACTMTY NOTES: <br />SWPPP Pro mar. BOLTON & MENK, INC <br />ADAM NAFSTAD <br />753.433.2851 <br />EROSION PREVENRDN PRACTICES: <br />Elevation of Water Quality Volume Slamge: <br />Contact Person <br />Phone <br />Phaxd construction will be used to extent practical or as indicated in the plans to minimize exposed sails. <br />Contractor. <br />N A <br />Designed Oiacharge for Water Quality Volume: <br />Areas not to be disturbed shall be delineated with flags. stakes, signs silt fence, etc. prior to work <br />Required Infiltration Volume: <br />Contact Person <br />Phone <br />beginning. The normal wetted pan star of all ditches or .wales, including storm water management pond <br />Person Responsible <br />slope., that drain waters from the H. must be stabilized within 200' of any property edge or discharge <br />For Inepecllons: <br />point including storm sewer inlets, within 24 hours of connection. <br />Contact Pman <br />Phone <br />Party Responsible far <br />Energy dissipation or other outlet treatment must be Installed within 24 hours of connection. <br />Long Tenn O&M of <br />Permanent Storm Water <br />All axpoved soils must be stabilized as soon ae possible but o no ease ,tar than 14 days attar the <br />Management FacllilY <br />construction octhiily has temporarily or permanently c ...d. <br />Contact Pman <br />Phone <br />Seed and /or mail, fertilizer, and mulch .hull be placed am indicated In the plane and project specifications. <br />Count ,Stale I Townshi Ran a Sections tolitude Lan itude Rapid stabilization shall be of type and quantity indicated in the pmject specification,. Additional <br />Anoka. MIN 32 25 26 45.2315 — 93.4568 rapid stabilization may be necessary to minimize erosion throughout the duration of the project. Type <br />and quantity shall be determined by the engineer —inspector prior to installation. <br />PRQJFCr DESCRIPTION: <br />This project includes disturbance of approximately 2.4 acres. Construction activities include water main. If the Contractor dockpiles material on site, he shall install the appropriate ­Ion control device, <br />sanitary sew r. storm sewer, bituminous parking, proposed building, and landscaping• around the stockpile and perform the beat management practice. possible to avoid erosion from the <br />stockpile. <br />Sails on the wile ore primarily of Hydrologic Sail Group Type A. with high infiltration capacity. <br />Planned Construction Start Date: 10/1/2010 <br />Estimated Construction Campl.Uon Data: 10 1 T011 <br />PROJECT ARM <br />Total Project Size (disturbed area) m 2.35 AC <br />Existing area of impervious surface — 0 AC <br />Post construction area of Impervious surface — 1.9 AC <br />Total new Impervious surface area created — 169 AC <br />SrOR n Ws TF <br />Type / Loan =Mno used If more than 1 oero of now Impervious surface Is created: <br />Wet sedimentation boa!" Regional PermanenRegional pond=% Alternative methods= <br />Infltrolfan t storm water <br />Filtration management not required= <br />Required Water Quality Volume: <br />N A <br />Design Water Ouafily Volume: <br />N A <br />Elevation of Water Quality Volume Slamge: <br />N A <br />Surface Area at Water Quality Volume Storage: <br />N A <br />Allowabla Oixharga of Water Quality Volume: <br />N A <br />Designed Oiacharge for Water Quality Volume: <br />N A <br />Required Infiltration Volume: <br />N A <br />Designed Infiltration Volume: <br />N A <br />Temporary (or permanent) sedimentation pond, are required for area, > 10 acres of disturbed soils <br />draining mails draining to one paint. <br />SEDIMENT CONTROL PRACTICES: <br />Inalallation e/ sill <br />(once and all other down gradient sediment protection measures shall be completed <br />prior to commencement of upstream land disturbing activities. <br />STIR fence shag be installed along constant contaunr with continuo.. lengths not to .....d 600 fact. <br />Am Indicated on plans silt fence will be periodically broken and hooked upalope in 'J —hook" or smile <br />patterns to provide pondinq and slow runoff. <br />No unbroken slope lengths greater than 75 feet v e permitted when elope fa 3:1 or greater. Slope shall <br />be broken with set fence or Marotta as indicated on plane. <br />Install ditch check. (8(arolla) v a shown in plan. Ditch checks to be Installed after street Is removed and <br />left In place until Mal restoration is established. <br />BMP <br />QUANTITY <br />INLET PROTECTION <br />11 EA <br />SILT FENCE <br />1350 LF <br />ROCK CONSTRUCTION ENTRANCE <br />1 EA <br />Due to the size of the disturbance and the total amount of now impervious area, this site requires <br />permanent storm water troobnenl. A regional detention basin downstream has been sized <br />by the City of Ramsey to handle dwelopment in this area. and the Owner has obtained psrrnission <br />to discharge into the regional basin. <br />E,Isting discharge patterns or maintained in the proposed condition. The parking lot lands to <br />drain from wool to Baal. In the southeast comer of the site, the proposed 24' mainline storm sewer <br />will discharge Into the 27' city maintained storm mewer system. From there, an 88' concrete arch <br />pipe discharges alarm water runoff to the regional basin. <br />Vehicle backing to be minimized to all practical e.lant.. All eroded material that leave, the construction <br />zone shall be collected by the contractor and returned to the site at the contractors expense. <br />NI stock piles shall be surrounded by sill fence and seeded with temporary seed and mulch. See erosion <br />and sediment control plans. <br />All dewalering an site during construction must be muted to temporary sedimentation basins. <br />Temporary sedimentation basins must be drained within 48 hours of any rainfall event. If the rock <br />filtered outlets plug or .e the pond not to drain within 48 hours. ponds am to be drained with pumps. <br />Pump inlet. should be protected with a geotextile membrane and rock filter setup as shown In the details, <br />approved alterative. Excessive sediment —laden water that Is not properly filtered will not be <br />Permitted to discharge from Bile. <br />Dewolering practices cannot cause downstream nuisance conditions erosion or non — permitted wetland <br />inundation causing adverse impact.. <br />All solid w PREVENTION: <br />All solid wools collected from the construction site must be disposed of in accordance with MPCA disposal <br />requirements. <br />Concrete washout must be contained in device such as provided by Neotan Brothers Concrete Washout LLC, <br />or equivalent unit Unit must be maintained to manufacturer rocommendollar. <br />All hazardous material, (e.g., oil. gasoline, fuel. antifreeze, paint, cleaning .,[vents curb" compounds, <br />ferlillzers• etc.) must be properly stored (Including secondary containment when nma eaary) to prevent spills. <br />looks or other discharge. Storage and disposal of hazardous waste must be in compliance with MPCA <br />regulations. <br />External washing areas must be limited to a defined area of the ails. All runoff containing any hazardous <br />material must be properly collected and disposed of. Defined ar must be contained with heavy— or <br />super —duly milt fence. NO ENGINE DECREASING ALLOWED ON SITE. <br />The contractor is responsible for monitoring air pollution and ensuring it does not exceed level. at by <br />local, stale or federal regulations. This includes dust created by work being performed on the wile. Air <br />pollution and dust control correction le considered incidental to the unit bid prices for which work is <br />being performed. Additional dual control measures may be required by the Engineer. <br />INSP CTIDN h tl � RM - <br />The per.1th"e must routinely Inspect the construction site once every seven (7) days during active <br />c,netrucilon and within 24 hours of a rainfall event greater than 0.5 inches In a 24 hour period. <br />All inspections performed during construction must be recorded and records retained an site with the <br />SWPPP in o cordance with the storm water permit. Record, must include a site map showing areas of <br />land disturbing aativl8es and area. where a,U,iti,s have temporarily or permanently ceased. <br />Sill fence, biorol[s and inlet protection devices must be maintained when non — functional or when <br />accumulated sediment reaches 1/3 of device height. <br />Off ails vehicle tracking to be removed within 24 hours of occurrence. <br />All non — functional BMPs must be repaired, replaced, or supplemented with functional BMP. within 24 hours <br />of discovery, or as own as field condition, allow access. <br />FINAL - R �ARILIZATION <br />The permitlee, must submit a Notice of Termination (N.O.T.) within 30 days of Mal .tablizall— or <br />transferring permit responsibility to another owner or operator. <br />The Contractor must ensure final stabilization of the site. Final stabilization shall include o minimum of <br />70,5 vegetation establishment (1DOR stabilized) on all pervious areas. <br />All temporary erosion control m ... u and BMPs must be removed as part . of the final mite Mobilization. <br />unless directed otherwise by owner or engineer. <br />IMPLEMENTATION SCHEDULE k PHASING <br />1) Install Inlet Protection. <br />2) Install rock construction entrances arW temporary rock check dame. <br />3) In.toll .ubdmin pipe (remove and reinstall check dams as necessary). <br />4) bntall bituminous pavement. <br />5) Inalall slrlping. <br />6) Remove inlet protection. <br />7) Add additional temporary Blips ae eaary during construction based on Inspection report.. <br />8) Ensure M e <br />al stabilization mea re are complete. - <br />9) Submit Notice of Termination (NOT) to MPCA within 30 days of final atabili-t1w. <br />All efts storm sewer Inlets, as wall as off site downstream inlets with potential to receive sediment shall RECORD RETENTION: <br />be protected with approved inlet protection measure s at all times. Inlet, shall remain protected until The SWPPP, all changes to It. and Inspections and maintenance records must be kept at the site during <br />site Is IGOK stabilized and vegetation Is at Iext 70K established. Inlet protection may be removed in actructian. All owners) must retain the following for 3 years after submittal of NOT: <br />winter, It the project has an approval letter from Jurisdictional authority or can produce it within 72 hours. 1) SWPPP; <br />2) Any other permits required for the project; <br />TEMPOR rry SEDIMENTATION BASINS tr DEWATERING 3) Inspection and maintenance logo; <br />Temporary sedlmanlalion basins a required prior to runoff leaving the construction site o entering surface 4) NI permanent operation and maintenance agreements for surface water facilities; <br />wal when 10 or r soil s of disturbed . drain to a • on location. The basin provide 5) NI design calculations for temporary and permanent for <br />e. water management. <br />3,800 cubic feet of storage below the outlet per acre drained. If hydraulic calculations am available, the <br />temporary sedimentation basin must provide a storage volume equivalent to the 2 —year, 24 —hour storm, PLAN SHEETS: <br />but in no came less than 1800 cubic feat per acre drained. The temporary sedimentation basin must be Sheet numbers C3. C4, C5, CO & CB of this plan set are also considered a part of the SWPPP for this <br />constructed and made operational concurrent Wth the start of soil distrubonce upgradlent of the pond. project. <br />° wdro . m°i a<wrmxm"wr,m'r'rwmaA°m T BOLTON 8. MENK, INC. <br />Consulting Engineers k Surveyors RAMSEY TOWN CENTER 12TH ADDITION rSA <br />PSOr LLC ADAM NAF6TA0. PE uxwxxM. MN MRM W MN SLEEP'r EYE MN WLUUx. MN STORM WATER POLLUTION PREVENTION PL4N <br />, tea M259 um a/i1/2.1. 9aM.LLL MN CH Asm MN pousu. MN MANUMNaCV. NN .WTI N NARRATIVE <br />