Laserfiche WebLink
CASE # 2 <br />CONSIDER INITIATING LANDSCAPE IMPROVEMENTS FOR 'NORTH <br />PARK' WITHIN THE COR <br />By: Mark Riverblood, Parks Supervisor <br />Background: <br />The purpose of this case is to consider initiating basic landscape improvements for <br />the so- called 'North Park' (naming to occur at a future time) within the northwest <br />quadrant of The COR. As the Commission members will recall, earlier this year, the <br />Commission recommended a different concept plan for 'North Park' - recognizing <br />that the intensity of use of the 'old swimming hole' may be too much for this 7 acre <br />neighborhood park (and would conceivably require extensive parking and <br />infrastructure). And that further, with the west portion of The COR being re- <br />envisioned with a large water feature, a public wading or swimming area may be <br />more appropriate there. <br />Observations: <br />Residents in the vicinity of this park space have requested to see both a park plan <br />and a timeline for implementation - expressing a desire to 'at least see some grass <br />and trees' in the near term. Staff conveyed caution about being over - extended in <br />terms of adding more operational expenses at this time, and noted that the Park <br />Trust Fund is being impacted significantly with the programmed Capital <br />Improvements, including those associated with the amphitheatre and the need to <br />complete Rhinestone Commons Et al. <br />While respecting the latter point, some improvements to this park may be <br />performed at a reasonable cost and may also include volunteer participation by this <br />same neighborhood. Additionally, improving the site may add in stabilizing the <br />immediate area and assist in home sales - a city objective that extends beyond just <br />providing recreational opportunities. <br />The improvements that are being recommended for consideration by staff at this <br />time are as follows, and may also be considered a generalized work plan; <br />• Import and grade topsoil as can be located for no cost (aside from existing <br />programmed operational budget for hauling).Funding required: performed as <br />time allows in Fall and Winter 2010/11 by maintenance staff. <br />• Tap watermain and bring to grade, to irrigate the larger landscape area <br />around the municipal well. Additionally, set meter and add irrigation <br />controller within the motor control cabinet - together with pipe, valves and <br />sprinkler heads for approximately three to four zones. <br />