Laserfiche WebLink
DISCUSS THE ACQUISITION OF REQUIRED EASEMENTS TO FACILITATE <br />IMPROVEMENT PROJECT #10 -24, WETLAND 656W OUTLET <br />By: Tim Himmer, City Engineer <br />Background: <br />In an effort to provide flood protection and to improve overall drainage through the watershed, <br />the City has identified a ditch project known as the 656W Wetland Outlet Project. This project <br />(as illustitated on the enclosed aerial photograph) would create an outlet for wetland 656W, the <br />large wetland complex south of Alpine Drive and east of Ramsey Blvd., through the construction <br />of approximately 3000 feet of drainage ditch and/or culvert installation. <br />The need for this project was identified in the early to mid 1990's, and a drainage easement plat <br />was prepared in 1995 to facilitate the acquisition of the necessary easements. Most of the <br />easements were acquired at that time, but the project was not advanced because the drainage <br />from this ditch was to flow into County Ditch #3166, which was seriously clogged. The City <br />restored County Ditch #3/66 to its original cross section in 2006 and it is now feasible to pursue <br />the 656W outlet project. <br />While the original intent of this project was to create a dedicated drainage way from the wetland <br />complex to the Rum River, a secondary improvement was identified to diminish the concern for <br />localized flooding in the area north of 156 Avenue in an effort to direct runoff into wetland <br />656W. A majority of the required easements to complete the original scope of the project are <br />secured, but two additional easements remain to be acquired to undertake the second portion of <br />the project. Staff has been working with the two property owners that would be impacted by the <br />remaining easement acquisitions and would like to present information and potential offers to the <br />Council for consideration. <br />One property owner has indicated to staff what it would take to acquire an easement from them, <br />while the other is still considering some of their options and will be responding to staff by the <br />end of the week. Once all the information is available it will be forwarded to the Council <br />under separate cover for review, and discussed in closed session. <br />This project has always been anticipated to be completed late this year when the weather turns <br />colder and the soils begin to freeze; performing the work at this time allows for easier access into <br />the area with minimal disruption. Funding for this project will be from the City Storm Water <br />Utility and there will no assessment to property owners. <br />Council Action: <br />Based upon discussion <br />Attachments: <br />Location Map <br />Easement Plat <br />Reviewed by: <br />City Administrator <br />Public Works Director /Principal Engineer <br />CC: 10/26/10 <br />CASE #7,C)19 <br />