Laserfiche WebLink
0259611 SEQ.xlsx <br />Cost Estimate SP 02- 596 -11 / SAP 199 - 107 -007 <br />11/03/2010 2:22 PM <br />ITEM NO. <br />ITEM DESCRIPTION <br />UNIT <br />PRICE UNIT <br />TOTAL PROJECT <br />PARTICIPATING - FEDERAL FUNDS <br />SP 02 -596 -11 <br />ANOKA COUNTY <br />SAP 199- 107 -007 (ALPINE DR) <br />CITY OF RAMSEY <br />SAP 199 - 020 -009 (CR 57) <br />CITY OF RAMSEY <br />STORM SEWER <br />ESTIMATED <br />QUANTITY <br />COST <br />ROADWAY <br />QUANTITIES ESTIMATED <br />SEGMENT <br />COST <br />ROADWAY <br />ESTIMED <br />ESTIMATED <br />SEGMENT <br />COST <br />ROADWAY <br />ESTIMED <br />ESTIMATED <br />SEGMENT <br />COST <br />ESTIMATED <br />QUANTITY <br />SEGMENT COST <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$25,000.00 <br />1 <br />$25.000.00 <br />0.71 <br />$17,750.00 <br />0.11 <br />$2.750.00 <br />0.08 <br />$2,000.00 <br />0.10 <br />$2,500.00 <br />2031.501 <br />FIELD OFFICE TYPE D <br />EACH <br />$15,000.00 <br />1 <br />$15.000.00 <br />0.71 <br />$10,650.00 <br />0.11 <br />$1,650.00 <br />0.08 <br />$1.200.00 <br />0.10 <br />$1.500.00 <br />2101.501 <br />CLEARING <br />ACRE <br />$2,000.00 <br />2.10 <br />$4.200.00 <br />2.10 <br />$4,200.00 <br />2101.502 <br />CLEARING <br />TREE <br />$80.00 <br />137 <br />$10,960.00 <br />137 <br />$10,960.00 <br />2101.506 <br />GRUBBING <br />ACRE <br />$2,000.00 <br />2.10 <br />$4,200.00 <br />2.10 <br />$4,200.00 <br />2101.507 <br />GRUBBING <br />TREE <br />$80.00 <br />142 <br />$11,360.00 <br />142 <br />$11,360.00 <br />2104.501 <br />REMOVE PIPE CULVERTS <br />LIN FT <br />8.001 <br />350 <br />$2,800.00 <br />350 <br />$2,800.00 <br />2104.501 <br />REMOVE CURB AND GUTTER <br />LIN FT <br />2.001 <br />2080 <br />$4,160.00 <br />2,080 <br />$4,160.00 <br />2104.501 <br />REMOVE FENCE <br />LIN FT <br />$3.00 <br />394 <br />$1,182.00 <br />394 <br />$1,182.00 <br />2104.505 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />$4.00 <br />258 <br />$1,032.00 <br />258 <br />$1,032.00 <br />2104.505 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SQ YD <br />$2.50 <br />317 <br />$792.50 <br />317 <br />$792.50 <br />2104.509 <br />REMOVE BITUMINOUS FLUME <br />EACH <br />$18.00 <br />1 <br />$18.00 <br />1 <br />$18.00 <br />2104.511 <br />SAWING CONCRETE PAVEMENT FULL DEPTH <br />LIN FT <br />$5.00 <br />48 <br />$240.00 <br />48 <br />$240.00 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />LIN FT <br />$3.00 <br />356 <br />$1,068.00 <br />356 <br />$1,068.00 <br />2104.523 <br />SALVAGE SIGN TYPE C <br />EACH <br />$25.00 <br />32 <br />$800.00 <br />32 <br />$800.00 <br />2104.523 <br />SALVAGE SIGN TYPE SPECIAL <br />EACH <br />$30.00 <br />3 <br />$90.00 <br />3 <br />$90.00 <br />2104.523 <br />SALVAGE MAIL BOX <br />EACH <br />$25.00 <br />9 <br />$225.00 <br />9 <br />$225.00 <br />2104.601 <br />HAUL SALVAGED MATERIAL <br />LUMP SUM <br />$1,000.00 <br />1 <br />$1,000.00 <br />1 <br />$1,000.00 <br />2105.501 <br />COMMON EXCAVATION P <br />CU YD <br />$8.00 <br />23808 <br />$190,464.00 <br />23,808 <br />$190,464.00 <br />2105.507 <br />SUBGRADE EXCAVATION <br />CU YD <br />$4.00 <br />7966 <br />$31,864.00 <br />7,966 <br />$31,864.00 <br />2123.509 <br />DOZER <br />HOUR <br />$125.00 <br />25 <br />$3,125.00 <br />25 <br />$3,125.00 <br />2130.501 <br />WATER <br />M GALLONS <br />$25.00 <br />100 <br />$2,500.00 <br />100 <br />$2,500.00 <br />2211.503 <br />AGGREGATE BASE CV CLASS 5 P <br />CU YD <br />$27.00 <br />3906 <br />$105,462.00 <br />3,906 <br />$105,462.00 <br />2221.503 <br />AGGREGATE SHOULDERING CV CLASS 5 <br />CU YD <br />$75.00 <br />57 <br />$4,275.00 <br />57 <br />$4,275.00 <br />2232.501 <br />MILL BITUMINOUS SURFACE 1.5" <br />SQ YD <br />$5.00 <br />39 <br />$195.00 <br />39 <br />$195.00 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GALLON <br />$2.50 <br />1843 <br />$4,607.50 <br />1,843 <br />$4,607.50 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIX 2,B <br />TON <br />$65.00 <br />598 <br />$38,870.00 <br />435 <br />$28,275.00 <br />163 <br />$10,595.00 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIX 3,F <br />TON <br />$65.00 <br />3580 <br />$232,700.00 <br />3,580 <br />$232,700.00 <br />2360.502 <br />TYPE SP 12.5 NON WEAR COURSE MIX 3,B <br />TON <br />$60.00 <br />2186 <br />$131,160.00 <br />2,186 <br />$131,160.00 <br />2411.618 <br />MODULAR BLOCK RETAINING WALL <br />SQ FT <br />$28.00 <br />925 <br />$25,900.00 <br />925 <br />$25,900.00 <br />2501.515 <br />15" RC PIPE APRON <br />EACH <br />$500.00 <br />2 <br />$1,000.00 <br />2 <br />$1,000.00 <br />2501.515 <br />24" RC PIPE APRON <br />EACH <br />$600.00 <br />1 <br />$600.00 <br />1 <br />$600.00 <br />2503.541 <br />15" RC PIPE SEWER DES 3006 CL III <br />LIN FT <br />$27.00 <br />914 <br />$24,678.00 <br />914 <br />$24,678.00 <br />2503.541 <br />18" RC PIPE SEWER DES 3006 CL III <br />LIN FT <br />$30.00 <br />336 <br />$10,080.00 <br />336 <br />$10,080.00 <br />2503.541 <br />21" RC PIPE SEWER DES 3006 CL III <br />LIN FT <br />$35.00 <br />591 <br />$20,685.00 <br />591 <br />$20,685.00 <br />2503.541 <br />24" RC PIPE SEWER DES 3006 CL III <br />LIN FT <br />$40.00 <br />952 <br />$38,080.00 <br />952 <br />$38,080.00 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN G OR H <br />LIN FT <br />$200.00 <br />36.2 <br />$7,240.00 <br />36.2 <br />$7,240.00 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 <br />LIN FT <br />$280.00 <br />79.4 <br />$22,232.00 <br />79.4 <br />$22,232.00 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 -4020 <br />LIN FT <br />$300.00 <br />6.9 <br />$2,070.00 <br />6.9 <br />$2,070.00 <br />2506.501 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020 <br />LIN FT <br />$325.00 <br />12.9 <br />$4,192.50 <br />12.9 <br />$4,192.50 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />$500.00 <br />29 <br />$14,500.00 <br />29 <br />$14,500.00 <br />2511.501 <br />RANDOM RIPRAP CL II <br />CU YD <br />$80.00 <br />16 <br />$1,280.00 <br />16 <br />$1,280.00 <br />2511.515 <br />GEOTEXTILE FILTER TYPE IV <br />SQ YD <br />$2.00 <br />37 <br />$74.00 <br />37 <br />$74.00 <br />2521.501 <br />6" CONCRETE WALK <br />SQ FT <br />$4.00 <br />2316 <br />$9,264.00 <br />2,316 <br />$9,264.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B418 <br />LIN FT <br />$10.00 <br />1471 <br />$14,710.00 <br />1,471 <br />$14,710.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B424 <br />LIN FT <br />$10.00 <br />3665 <br />$36,650.00 <br />1,833 <br />$18.330.00 <br />1832 <br />$18,320.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B612 <br />LIN FT <br />$12.00 <br />43 <br />$516.00 <br />43 <br />$516.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />$13.00 <br />1739 <br />$22,607.00 <br />870 <br />$11,303.50 <br />870 <br />$11,303.50 <br />2531.503 <br />CONCRETE MEDIAN <br />SQ YD <br />$5.00 <br />389 <br />$1,945.00 <br />389 <br />$1,945.00 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />$40.00 <br />245 <br />$9,800.00 <br />245 <br />$9,800.00 <br />2531.604 <br />CONCRETE DRAINAGE FLUME <br />SQ YD <br />$40.00 <br />5 <br />$200.00 <br />5 <br />$200.00 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />$35.00 <br />96 <br />$3,360.00 <br />96 <br />$3,360.00 <br />2540.602 <br />INSTALL MAIL BOX SUPPORT <br />EACH <br />$120.00 <br />9 <br />$1,080.00 <br />9 <br />$1,080.00 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$5,000.00 <br />1 <br />$5,000.00 <br />0.71 <br />$3,550.00 <br />0.11 <br />$550.00 <br />0.08 <br />$400.00 <br />0.10 <br />$500.00 <br />2564.531 <br />SIGN PANELS TYPE C <br />SQ FT <br />$26.00 <br />211 <br />$5,486.00 <br />211 <br />$5,486.00 <br />2564.537 <br />INSTALL SIGN TYPE SPECIAL <br />EACH <br />$60.00 <br />4 <br />$240.00 <br />4 <br />$240.00 <br />2564.550 <br />DELINEATOR TYPE X4 -7 <br />EACH <br />$70.00 <br />5 <br />$350.00 <br />5 <br />$350.00 <br />2565.511 <br />TRAFFIC CONTROL SIGNAL SYSTEM <br />SIG SYS <br />$250,000.00 <br />1 <br />$250,000.00 <br />0.25 <br />$62,500.00 <br />0.50 <br />$125,000.00 <br />0.25 <br />$62,500.00 <br />2565.601 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM <br />LUMP SUM <br />$15,000.00 <br />1 <br />$15,000.00 <br />1 <br />$15,000.00 <br />2565.602 <br />SIGNAL SERVICE CABINET <br />EACH <br />$15,000.00 <br />1 <br />$15,000.001 <br />1 <br />$15,000.00 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LIN FT <br />$2.001 <br />3447 <br />$6,894.001 <br />3,447 <br />$6,894.00 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$150.001 <br />37 <br />$5,550.001 <br />37 <br />$5.550.00 <br />1 <br />P: \02- 596 -11 \Documents \Road & Bridge Design \Estimate \0259611 SEQ.xlsx Page 1 of 2 <br />