My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 11/09/2010
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2010
>
Agenda - Council Work Session - 11/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:48:11 PM
Creation date
11/4/2010 2:44:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
11/09/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT rrC" <br />COST- SHARING AGREEMENT <br />FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY <br />USING FEDERAL, COUNTY STATE AID FUNDS AND /OR LOCAL TAX LEVY DOLLARS <br />ITEMS <br />COUNTY SHARE <br />CITY SHARE <br />Concrete Curb & Gutter <br />50% <br />50% <br />Concrete Curb & Gutter for Median Construction <br />100% <br />0% <br />Concrete Median <br />100% <br />0 0 <br />Concrete Sidewalk <br />0% <br />100% <br />Concrete Sidewalk Replacement <br />100% <br />0% <br />Bikeways <br />0% <br />100% <br />Bikeway Replacement <br />100 %, <br />0% <br />Unless existing trail not placed at edge of R1W <br />Construction or Adjustment of Local Utilities <br />0% <br />100% <br />Grading, Base and Bituminous <br />100% <br />0% <br />Storm Sewer <br />based on state aid letter * <br />based on state aid letter' <br />Driveway Upgrades <br />100 %, in -kind <br />100 %, of up- grades <br />Traffic Signals, new & replacements (communities larger than 5,000) M. the cost of its <br />the cost of its legs of <br />w/ State Aid approved SJR <br />legs of the intersection <br />the intersection plus I/. <br />the cost of the County legs <br />of the intersection <br />Traffic Signals, new & replacements (communities less than 5,000) 100% <br />0% <br />w/ State Aid approved SJR <br />Traffic Signal, w/o State Aid approved SJR <br />0% <br />100% <br />EVP <br />0% <br />100% <br />Engineering Services <br />.3 <br />.3 <br />Right -of -Way <br />100% ° <br />0% <br />Street Lights <br />0% <br />100% <br />Noise Walls 100 %, if not previously notified' 100 %, if previously notified 5 <br />`1 The County pays for 100% of Standard Median Design such as plain concrete. If a local unit of government requests decorative <br />median such as brick, stamped concrete, or landscaping, the local unit will pay the additional cost above the cost of standard <br />median. <br />'2 In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage cost <br />shares will be computed by the proportion of contributing Flow outside the County right of way to the total contributing flow. <br />- 3 Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount <br />of 8% of the construction costs paid by that agency. <br />`4 In the event that the Township or City requests purchase of right -of -way in excess of those right -of -ways required by County <br />construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a <br />Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right -of -way, <br />in which case the Township or City may pay for that portion of the right -of -way. Acquisition of right -of -way for new alignments shall <br />be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement with <br />the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that existing <br />alignment. In addition, any costs, including right -of -way costs, incurred by the County because a Township or City did not acquire <br />sufficient right -of -way during the platting process or redevelopment process as requested by the County shall be paid by the <br />Township or City. <br />- 5 Notification includes any letter to the agency indicating that noise will potentially be an issue in the future, likely received during the <br />Plat Review Process. Maintenance shall be the responsibility of the agency paying for the initial installation. When the County is <br />the responsible agency, it shall pay 100% of Standard Noise Wall Cost. If a local agency requests decorative noise walls, the <br />requesting agency will pay the additional cost above the cost of standard noise wall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.