Laserfiche WebLink
0259611 SEQ.xlsx <br />11/03/2010 2:22 PM <br />ITEM NO. ITEM DESCRIPTION <br />UNIT <br />PRICE UNIT <br />TOTAL PROJECT <br />ESTIMATED <br />QUANTITY COST <br />SP 02-596-11 <br />ANOKA COUNTY <br />ROADWAY <br />SEGMENT <br />QUANTITIES COST <br />ESTIMATED <br />PARTICIPATING -FEDERAL FUNDS <br />SAP 199-107-007 (ALPINE DR) SAP 199-020-009 (CR 57) <br />CITY OF RAMSEY CITY OF RAMSEY STORM SEWER <br />ROADWAY ROADWAY <br />SEGMENT SEGMENT ESTIMATED <br />QUANTITIES COST QUANTITIES COST QUANTITY SEGMENT COST <br />ESTIMATED ESTIMATED <br />2575.501 SEEDING <br />ACRE <br />$85.00 <br />4 <br />$366.35 <br />4.31 <br />$366.35 <br />$698.700.00 <br />$361,565.35 <br />2575.502 SEED MIXTURE 325 <br />POUND <br />$10.00 <br />5 <br />$50.00 <br />5 <br />$50.00 <br />$151,211.50 <br />$99,650.00 <br />2575.502 SEED MIXTURE 328 <br />POUND <br />$10.00 <br />25 <br />$250.00 <br />25 <br />$250.00 <br />$1,488,645.35 <br />$1,211,476.85 <br />2575.502 SEED MIXTURE 340 <br />POUND <br />$10.00 <br />239 <br />$2,390.00 <br />239 <br />$2,390.00 <br />8% CONSTRUCTION ENGINEERING <br />$119,091.63 <br />2575.505 SODDING TYPE SALT RESISTANT <br />SQ YD <br />$3.00 <br />1920 <br />$5,760.00 <br />1,920 <br />$5.760.00 <br />PROJECT TOTAL <br />2575.511 MULCH MATERIAL TYPE 1 <br />TON <br />$120.00 <br />1 <br />$132.00 <br />1.1 <br />$132.00 <br />$116,691.98 <br />2575.519 DISK ANCHORING <br />ACRE <br />$50.00 <br />1 <br />$30.00 <br />0.60 <br />$30.00 <br />2575.523 EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />$1.00 <br />11517 <br />$11,517.00 <br />11,517 <br />$11,517.00 <br />2575.532 FERTILIZER TYPE 3 <br />POUND <br />$0.60 <br />435 <br />$261.00 <br />435 <br />$261.00 <br />2575.571 RAPID STABILIZATION METHOD 3 <br />M GALLONS <br />$275.00 <br />15 <br />$4,070.00 <br />14.8 <br />$4,070.00 <br />2575.623 HYDROSEEDING <br />M GALLONS <br />$220.00 <br />1 <br />$121.00 <br />0.55 <br />$121.00 <br />2582.501 PAVT MESSAGE (LT ARROW) PREFORMED THERMOPLASTI <br />EACH <br />$300.00 <br />6 <br />$1,800.00 <br />6 <br />$1,800.00 <br />2582.501 PAVT MESSAGE (RT ARROW) PREFORMED THERMOPLAST <br />EACH <br />$300.00 <br />6 <br />$1,800.00 <br />6 <br />$1,800.00 <br />2582.502 24" SOLID LINE WHITE -PREFORMED THERMOPLASTIC <br />LIN FT <br />$20.00 <br />141 <br />$2,820.00 <br />141 <br />$2,820.00 <br />2582.502 24" SOLID LINE YELLOW -PREFORMED THERMOPLASTIC <br />LIN FT <br />$20.00 <br />1826 <br />$36,520.00 <br />1,826 <br />$36,520.00 <br />2582.502 4" SOLID LINE WHITE-EPDXY <br />LIN FT <br />$0.50 <br />8378 <br />$4,189.00 <br />8,378 <br />$4,189.00 <br />2582.50214" SOLID LINE YELLOW-EPDXY <br />LIN FT <br />$0.501 <br />1419 <br />$709.501 <br />1,419 <br />$709.50 <br />2582.50214" DOUBLE SOLID LINE YELLOW-EPDXY <br />LIN FT 1 <br />$2.001 <br />4889 <br />$9,778.001 <br />4,889 <br />$9,778.00 <br />2582.503 CROSSWALK MARKING -PREFORMED THERMOPLASTIC <br />SQ FT 1 <br />$12.00 <br />39 <br />$468.00 <br />39 <br />$468.00 <br />TOTAL 1 <br />$1,488,645.35 <br />$1,060,265.351 <br />1 $156,253.501 <br />1 $120,915.00 $151,211.50 <br />FUNDING GROUP <br />TOTALS <br />TOTAL FEDERAL ELIGIBLE ITEMS <br />FEDERAL FUNDS AVAILABLE <br />% FEDERAL FUNDING <br />$1,488,645.35 <br />$1,488,645.35 <br />$981,000.00 <br />65.9% <br />Group 1 <br />$1,060,265.35 <br />$1,060,265.35 <br />$698,702.55 <br />$698,700.00 <br />Group 2 <br />$156,253.50 <br />$156,253.50 <br />$102,969.24 <br />$102,970.00 <br />PRORATA PERCENTAGE <br />PROJECT <br />TOTALS <br />ANOKA COUNTY <br />TOTALS <br />ANOKA COUNTY <br />FEDERAL FUNDS <br />ANOKA COUNTY <br />STATE AID FUNDS <br />ANOKA COUNTY <br />LOCAL FUNDS <br />CITY OF RAMSEY <br />TOTALS <br />CITY OF RAMSEY <br />FEDERAL FUNDS <br />CITY OF RAMSEY <br />STATE AID FUNDS <br />CITY OF RAMSEY <br />LOCAL FUNDS <br />ROADWAY <br />$1,337,433.85 <br />$1,060,265.35 <br />$698.700.00 <br />$361,565.35 <br />Prorata Percentage <br />$277,168.50 <br />$182,650.00 <br />$94,518.50 <br />10.48 <br />DRAINAGE (100.0% County, 0.0% Ramsey) <br />$151,211.50 <br />$151,211.50 <br />$99,650.00 <br />$51,561.50 <br />CONSTRUCTION TOTAL <br />$1,488,645.35 <br />$1,211,476.85 <br />$798,350.00 <br />$413,126.85 <br />$277,168.50 <br />$182,650.00 <br />$94,518.50 <br />8% CONSTRUCTION ENGINEERING <br />$119,091.63 <br />$96,918.15 <br />$96,918.15 <br />$22,173.48 <br />$22,173.48 <br />PROJECT TOTAL <br />$1,607,736.98 <br />$1,308,395.00 <br />$798,350.00 <br />$510,045.00 <br />$299,341.98 <br />$182,650.00 <br />$116,691.98 <br />PRORATA PERCENTAGE <br />Calculation of Prorata Percentage <br />Prorata Items: Mobilization, Field Office and Traffic Control <br />TOTAL <br />COST EXCLUDING PRORATA ITEMS <br />ANOKA COUNTY <br />CITYOF RAMSEY <br />ROADWAY <br />STORM SEWER <br />199-107-007 <br />199-020-009 <br />$1,443,645.35 <br />$1,028,315.35 <br />$146,711.50 <br />$151,303.50 <br />$117,315.00 <br />Prorata Percentage <br />100.0 <br />71.23 <br />10.16 <br />10.48 <br />8.13 <br />P:\02-596-11\Documents\Road & Bridge Design\Estimate\0259611 SEQ.xlsx Page 2 of 2 <br />Group 3 <br />$120,915.00 <br />$120,915.00 <br />$79,681.58 <br />$79,680.00 <br />Group 4 <br />$151,211.50 <br />$151,211.50 <br />$99,646.62 <br />$99,650.00 <br />