My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/09/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 11/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:47:37 PM
Creation date
11/4/2010 3:13:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/09/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANITARY SEWER EXTENSIONS - Bunker Lake Boulevard <br />APPROX. <br />ITEM I I QUANTIT <br />1 MOBILIZATION <br />2 TRAFFIC CONTROL <br />3 CONNECT TO EXISTING SEWER PIPE <br />4 ADJUST FRAME & RING CASTING BETWEEN CONST. SEASONS <br />5 8" PVC SEWER PIPE (SDR 35) <br />6 18" PVC SEWER PIPE (SDR 35) <br />7 21" PVC SEWER PIPE (SDR 35) <br />8 CONSTRUCT 48" MANHOLE <br />9 CASTING ASSEMBLY NEENAH R-1642 (SANITARY SEWER) <br />10 CHIMNEY SEAL <br />SUBTOTAL SEWER <br />CONTINGENCIES (10%) <br />TOTAL <br />ENGINEERING. CONSTRUCTION STAKING & ADMIN. (18° <br />0.7 <br />LS <br />$ <br />5,000.00 <br />$ <br />3,500.00 <br />0.0 <br />LS <br />$ <br />6,000.00 <br />$ <br />- <br />0.0 <br />EACH <br />$ <br />150.00 <br />$ <br />36,000.00 <br />0.0 <br />EACH <br />$ <br />225.00 <br />$ <br />- <br />140.0 <br />LF <br />$ <br />30.00 <br />$ <br />4,200.00 <br />4,000.0 <br />LF <br />$ <br />50.00 <br />$ <br />200,000.00 <br />0.0 <br />LF <br />$ <br />58.00 <br />$ <br />- <br />180.0 <br />LF <br />$ <br />154.00 <br />$ <br />27,720.00 <br />12.0 <br />EACH <br />$ <br />455.00 <br />$ <br />5,460.00 <br />12.0 <br />EACH <br />$ <br />175.00 <br />$ <br />2,100.00 <br />0.0 <br />EACH <br />$ <br />1,000.00 <br />$ <br />242,980.00 <br />$ <br />24,298.00 <br />$ <br />267,278.00 <br />$ <br />48.1 10.04 <br />WATERMAIN IMPROVEMENTS - Armstrong Boulevard Crossing <br />APPR <br />ITEM QUANTIT <br />NO. ITEM Y UNIT UNIT PRICE AMOUNT <br />1 MOBILIZATION <br />2 CONNECT TO EXISTING WATERMAIN <br />3 24 -Inch HDPE DR 26 CASING (TRENCHLESS INSTALL) <br />4 16" DIP WATERMAIN (INSERT IN CASING) <br />5 16" DIP WATERMAIN <br />6 16" 45 DEGREE BENDS <br />7 16" BUTTERFLY VALVE AND BOX <br />8 16" TEES <br />9 16" PLUGS <br />10 HYDRANT W/ 6" LEAD AND VALVE <br />11 16" BY 6" TEES <br />SUBTOTAL <br />CONTINGENCIES (10%) <br />TOTAL <br />ENGINEERING, CONSTRUCTION STAKING & ADMIN. (18% <br />SUBTOTAL WATERMAIN <br />0.15 <br />LS <br />$ <br />5,000.00 <br />$ <br />750.00 <br />1.0 <br />EACH <br />$ <br />750.00 <br />$ <br />750.00 <br />120.0 <br />LF <br />$ <br />300.00 <br />$ <br />36,000.00 <br />120.0 <br />LF <br />$ <br />50.00 <br />$ <br />6,000.00 <br />0.0 <br />LIN FT <br />$ <br />55.00 <br />$ <br />- <br />EACH <br />$ <br />900.00 <br />$ <br />- <br />1.0 <br />EACH <br />$ <br />2,750.00 <br />$ <br />2,750.00 <br />0.0 <br />EACH <br />$ <br />1,500.00 <br />$ <br />- <br />0.0 <br />EACH <br />$ <br />450.00 <br />$ <br />0.0 <br />EACH <br />$ <br />4,600.00 <br />$ <br />0.0 <br />EACH <br />$ <br />1,000.00 <br />$ <br />$ <br />46,250.00 <br />$ <br />4,625.00 <br />$ <br />50,875.00 <br />$ <br />9,157.50 <br />$ <br />60.032.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.