My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/09/2010
Ramsey
>
Public
>
Agendas
>
Council
>
2010
>
Agenda - Council - 11/09/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:47:37 PM
Creation date
11/4/2010 3:13:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/09/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY <br />2011 PROPOSED SCHEDULE OF RATES, FEES AND CHARGES <br />SERVICE OR LICENSE <br />SPECIAL NOTES <br />2010 <br />Adopted <br />Air Conditioner Replacement <br />47.00 <br />Deck Permit <br />94.00 <br />Demo Permit <br />94.00 <br />Electrical Permit Fee <br />Per Attached Sheet <br />Erosion Control Escrow <br />State R uired <br />1500.00 <br />Fence Permit <br />Over 6 feet in height <br />LMC Fee Table <br />Fireplace Permit <br />Cover 2 trips <br />94.00 <br />Furnace Replacement <br />47.00 <br />Inspections -After Hours/Weekend <br />70.50/lu/minimum2 hr <br />investigation Fee <br />Work Started Without a Permit <br />Equal to Permit Fee <br />Gas Water Heater Replacement <br />47.00 <br />Lawn Irrigation -Residential <br />Cover 1 trip <br />47.00 <br />Lawn Irrigation -Commercial Multi <br />60.00 <br />Mechanical Permit -Residential <br />New Construction <br />150.00 <br />Remodel/Addition <br />94.00 <br />Mechanicalpermit-Commercial <br />New Construction <br />1% of Job Value/Minimum$200.00 <br />Remodel/Addition <br />1%of Job Value/Minimum $100.00 <br />Moving Structure Permit <br />94.00 <br />Moving Structure Permit Site Inspection <br />94.00 <br />Plan Check fee 65%of commercial mechanicalpermit) <br />65%of Comm Mech Permit fee <br />Mobile Home Tie Down <br />45.00 <br />Mobile Home Water Hookup <br />60.00 <br />Outside Consultants -Plan check and/or inspections <br />All administrative and Overhcad Costs <br />Actual Costs <br />Pemtitflns tion Cud -Replacement or Duplicate <br />5.00 <br />Plumbing rmit- Residential/Sin Ie Family <br />New Construction <br />200.00 <br />Remodel/Addition <br />94.00 <br />Plumbin permit- Commercial <br />New Construction <br />1% of Job Value/Minimum$300.00 <br />Remodcl/Addition <br />1%of Job Value/Minimum $150.00 <br />Reins tion Fees <br />- <br />47.00 pertri <br />Re-Reofin Shin lin Permit -Residential <br />Cover 2 tris <br />94.00 <br />Re-Roofing/Shingling Permit-Commercial/Multi-FamilyLMC <br />Fee Table <br />Re Sidiruz Permit <br />lCmcr t tris <br />94.00 <br />Replacement Windows <br />Residential/re inspection <br />94.00 <br />Septic sstem rmit-residential <br />150.00 <br />Septic sstem reit-commercial <br />250.00 <br />Septic Tank Installation Permit -Residential <br />150.00 <br />Service Availability Charge SAC <br />current MCES mtes <br />2,100.00 <br />SACHandlin Fee-peraddress <br />200.00 <br />Septic Tank Pumping Permit <br />10.00 <br />Sewer permit(Utility Connection Residential <br />75.00 <br />Sewer permit (Utility Connection) -Commercial <br />2% of Job ValueMlinimum$250.00 <br />1,Site Evaluation Fee <br />45.00 <br />Swimmin 1 permit <br />125.00 <br />2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.