Laserfiche WebLink
-262- <br /> <br />2:3. <br /> <br />24. <br /> <br />25, <br /> <br />26. <br /> <br />27, <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />Pest Coutrot. Insects and rodents on the site shall be controlled and exterminated as aeeded <br />and additional control may be directed by the City Lnspector subject to ali applicable laws, <br />rules and regulations. <br /> <br />Water Quality. Surface and ground waters or/ginating outside and passing through or <br />adjacent to the Subject' Property and runoff water discharged from the Subject Property shall, <br />at its point of departure from the Subject Property., meet all applicable federal and state water <br />quality, standards as they e,'dst from time to time during the per/od of the Permit. The <br />Permirtee shall perform any water treatment necessary to comply with applicable state and <br />.federal water quality, standards as they exist from time to time during the per/od of this <br />Perm.it. In the event of future development, grading and drainage plans shall be submitted <br />to and approved by the City Engineer and berming shall be installed as necessary to control <br />run-off. <br /> <br />Off-Street ParMng. Off-street parking shall be provided such that there is at least one <br />parking space for each-employee on the maximum working skirt plus a sufficient number of <br />additional parking spaces to provide off street parking to ali customers and visitors. <br /> <br />Surfacing of Work Areas. Ali storage areas, parking areas and driveway areas shall be <br />surfaced with bituminous or concrete, installation of concrete curbing around the perimeter <br />of ail existin~ pavement shall be deferred until a future expansion of the facility. <br /> <br />Electrical. The building's electrical system must be inspected and brought up to code <br />before the effective date of this Permit. Aa affidavit of compliance shall be filed with the <br />City within five working days a&er final inspection. <br /> <br />Scope and Conduct of Operations. Tlae operations permitted by this Permit may be <br />performed on the Subject Property in conformance with existing statutory and regulatory <br />authority arid t~eqUirements of the City, Anoka County, Minnesota (?County), and the <br />/vLinnesota Pollution Control Agency ("MPCA"). <br /> <br />Furnaces. Pen'nittee may use two melt furnaces. <br /> <br />Closure Due to CUP Revocation, Other Circumstances. In the event this Permit is <br />revoked, or the Permittee closes operation of the metal .and rail recycling and storage <br />operation for any reason, including but without limitation, order of the court or other agency <br />of competent jurisdiction, bankruptcy, incoNency, or abandonment, the Permittee shall <br />immediately proceed to remove all feedstock and other material from the site. in the event <br />the Permirtee fails to comply with the terms of this Permit, the City may, upon 30 days <br />wr/rten notice to the Permit-tee enter into the property and perform ali such Obligations, the <br />costs of which shall be borne by the Permit'tee or, in default thereof; by its surety. <br /> <br />RESOLUTION #01-06-241 <br /> Page 5 of 9 <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />