Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br /> Description of Changes <br />F & I Sign Panels Type C add 16 SF @ <br />$21.00/SF <br /> <br />Pavement Message (Arrow) Epoxy add 8 EA <br />@ $150/EA <br /> <br />4" Solid Line White Epoxy add 3500 LF @ <br />$0.30/LF <br /> <br />4" Solid Line Yellow Epoxy add 12,000 LF @ <br />$0.30/LF <br /> <br />Pavement Marking Removal- Permanent <br />delete 480 LF @ $2.00/LF <br /> <br />Seed Mixture 60B add 60 LBS @ $3.00/LB <br /> <br />Mulch Material 'l'ype I add 1.5 Ton @ <br />$125.00FFon <br /> <br />Commercial Fertilizer Analysis 20-5-10 add <br />0.15 Ton @ $150/Ton <br /> <br /> Totals <br />Net Change in Contract <br /> <br />INCREASE <br /> <br /> $336.00 <br /> <br />DECREASE <br /> <br />$1,200.00 <br /> <br />$1,050.00 <br /> <br />$3,600.00 <br /> <br />-$180.00 <br /> <br />($960.00) <br /> <br />$187.50 <br /> <br />$22150 <br /> <br />$61,427.50 <br />$60,062.50 <br /> <br />($1,365.00) <br /> <br />Justification: After plan approval, Anoka County changed their policy on connections to County <br /> <br />Roads and requested the City to install an intersection at County Road No. 116 with both right and <br />left turn lanes in each direction and through lanes. The County agreed to assist with the revisions to <br />the intersection of County Road No. 57 and Sunwood Drive. The above revised quantities and costs <br />are the result of deleting the proposed right turn lane and adding a full intersection at County Road <br />No. 116 and Sunwood Drive. The proposed changes are shown on attached Plan Sheets 16, 19A <br />and 19B. The City has also decided to change the configuration of the Stormwater Pond shown on <br />Plan Sheet No. 12 which resulted in 1500 CY of additional excavation. <br /> <br />Due to the change order, the contract period will be: Unchanged <br /> <br />Original Contract Amount <br /> <br />Previous contract changes, Change Order # __ to # <br /> <br />Prior approved contract amount <br /> <br />Change in contract due to this change order <br /> <br />Total contract including this and previous change orders <br /> <br />$ 769,415.83 <br />$ N/A <br /> <br />$ 769,415.83 <br />$ 6O,O62.5O <br />$ 829,478.33 <br /> <br />Original contract period' October 4, 2002 <br />Change contract period from previous Change Order <br />Contract period including this and all previous change orders:. <br /> <br />N/A <br /> <br />October 4, 2002 <br /> <br />This document will become a supplement to the contract and all provisions will apply hereto. <br /> <br />G:\Municipal~ARAMS EY~3156~ra3156changeorder 1.doc <br /> <br />-85- <br /> <br /> <br />