My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/08/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 10/08/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:12:10 AM
Creation date
9/3/2003 11:10:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/08/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
memo <br /> <br />Date: <br /> <br />To: <br /> <br />Cc: <br /> <br />From: <br /> <br />RE: <br /> <br />10/2/2002 <br /> <br />James E. Norman, City Administrator <br /> <br />City Council Members <br /> <br />Megan Wald, Associate Planner <br /> <br />Verizon Wireless Lease Agreement <br /> <br />The City Council approved a conditional use permit for Verizon Wireless on October 9, 2001, to <br />install cellular antennas on the City Water Tower #2 and to locate related equipment cabinets inside <br />the water tower on the ground floor. Item #4 of the approved conditional use permit states "The <br />amount of space leased upon the ground floor will be 152 square feet." The lease agreement the City <br />Attorney, Verizon Wireless, and Principal City Engineer, Brian Olson completed, states Verizon <br />Wireless will lease 311 square feet. <br /> <br />The 152 square feet in the conditional use permit does not reflect the updated space Verizon Wireless <br />requires for their equipment cabinets and chain link fence they are installing around their equipment. <br /> <br />The City and Verizon Wireless have signed the lease agreement and therefore the conditional use <br />permit should be consistent with the signed agreement. <br /> <br />This memo approved by the City Council on the consent agenda will serve as official action to <br />change item #4 of the conditional use permit for Verizon Wireless, bom 152 square feet to 311 <br />square feet of lease space in the City water tower. <br /> <br />Thank you <br /> <br />-11- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.