My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/11/2002
Ramsey
>
Public
>
Agendas
>
Council
>
2002
>
Agenda - Council - 09/11/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:10:50 AM
Creation date
9/3/2003 12:17:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/11/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I CHANGE OWNER X <br /> ORDER ARCHITECT X' <br /> _ CONTRACTOR X' <br /> <br /> m OTHER X <br /> AIA DOCUMEN~T GT0[ ~ '-- <br /> I THIS DOCUHENT HAS IHPORTANT LEGAL CONSEQUENCES; CONSULTATION VVlTH AN A'I-rORNEY IS ENCOURAGED RESPECT TO ITS <br /> WITH <br /> COPIPLETION <br /> I OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DEAF'rED AIA Docur'IENT PlAY BE MADE BY USING AIA DOCUMENT D401. <br /> <br /> I PROJECT: Renovation of the existing CHANGE ORDER NO.: 'I'VVO (2) <br /> (Name. address) Ramsey City Hall <br /> · 15153 Nowthen Bivd, DATE: September S, 2002 <br /> ~ ' Ramsey MN 55303 <br /> -- TO ARCHITECT'S PROJECT #: 1272.03 <br /> CONTRACTOR: <br /> ~ (Name, address) Braun Built Corporation . ' <br /> · P.O. Box 1304 CONTRACT DATE: JUNE 19, 2002 <br /> Burnsville, MN 55337 <br /> I CONTRACT FOR: Remodeling <br /> <br /> i The contract is changed as follows: PR#3 items accepted . ' ' <br /> ~ '~1 .) Service Count, er modifications $ 253.00 ' <br /> m. 2'i) Construct 42 drywall enclosures at unit heaters and add P-lam tops $ 276.00 <br /> 3.) Paint exposed round duct in new rooms. $ 859.00 ' <br /> ~ 4.) Re-key doors as requested by owner, rooms 123, 200, 203, & 200 . ' $ 485.00 <br /> · 5.) Add a 24"X24" ceiling access panel and framing in lower level women's toilet $ 165.00 <br /> 6.) Revise existing mechanical system to supply air to lobby $ 978.00 <br /> · 7,) Relocate 3 pneumatic thermostats as directed by Engineer . $ 660.00 <br /> ~ 8.) Install a combination Emergency/exit light in room l20 per Fire Chief $ 132.00 <br /> 9.) Relocate one clock outlet from demolished wall to existing wail $ 213.00 <br /> _ I 0.) Install a lighting contactor in rooms 203 & 204. $ 978.00 <br /> I Total this change erso~, S ;,999.00 <br />, The original Contract Jum wa $ 6,580.00 · <br />· Net change by previously authorized Change Orders - $ 1,168.00 <br /> The Contract Sum prior to this Change Order was . $ 97,748.00 <br />· The Contract Sum will be increased by this change order in the amount of $ 4,999.00 <br /> I The new Contract Sum including this Change Order will be $ 102,747.00 <br /> <br /> _ The Contract time will be unchanged. <br /> The date of Substantial Completion as of the date of this Change Order therefore is September 23, 2002 <br /> <br /> NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been <br />~ authorized by Construction Chanj~e Directive. <br />· Authorized: ' <br /> <br />· ARCHITECT ' cONTRACTOR OWNER <br /> <br /> Address Address Address <br />u 222 N. 2.nd Sq;eet_. P.O. Box 1304 Ramsey City Hall <br />· Minnea~oli~N~401/ . Burnsville, MN 55337 15153 Nowthen Blvd. <br />· /~/ .// ~.~ ;~, Ramsey MN 55303 <br /> <br />· <br />I DATE' ~' I /' /' DATE DATE <br /> <br />I AIA <br /> DOCUPIENT GT01; ~ O--"~"~ ~-=~ ~ ~--'~"~- ~ i 9-'~~' <br /> <br />-129- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.