Laserfiche WebLink
Braun Bu <br />Corporation <br /> <br />P.O. Box 1304 <br />Burnsville, MN 55337 <br /> <br />TO: <br /> <br />PROJECT: <br /> address: <br /> <br />BKV Group <br />222 N. Second Street <br />Minneapolis, MN 55401 <br />Attn: Jeff Sandnas <br /> <br />Ramsey City Hall <br />15153 Nowthen Blvd. <br />Ramsey, MN 55303 <br /> <br />PROPOSAL <br /> PROPOSAL REQUEST NO: 3 <br /> date: 8/20/02 <br /> <br /> CONTRACT FOR: General Construction <br /> CONTRACT DATE: June 19, 2002 <br /> OUR JOB NO: 235 <br />ARCHITCT'S PROJECT NO.: 1272,03 <br /> CONTRACT DATE: June 19, 2002 <br /> <br /> ! <br /> <br />I <br />I <br />I <br />I <br />I <br />I. <br /> <br />We are proposing the following items per the proposal request dated 8/12/02: <br /> <br />(Architectural) Service counter modifications (employee side): LeR unit to have 1/2" adjustable <br /> shelving with divider at center, shelf depth to be 18" max. Right unit to add (2) pencil drawers <br /> approximately 2-1/2" deep with a 3-4" front. <br /> <br />(Architectural) Construct drywall enclosures for (2) relocated unit heaters 42" high. F&I P-lam <br />tops with a 1" overhang, color to match servuice counter. <br /> <br />3. (Architectual) Paint (4) large ducts @ the two new rooms on 2nd floor (2 coats). <br /> <br />(Architectual) Rekey: (2) doors @ hall #123, extedor door @ room #207, new conference room <br /> door, new door @ room #203 is already figured; Provide hardware group #1 on new conference <br /> room door except new Iockset, switch out existing Iockset on door in hall #200 with the passage <br /> set on the new conference room door. <br /> /. ~1~ro/L <br />(Architectual) Add a 24"x 24" access panel and 2-1/2" framing over existing @ W-PJR ceiling. <br /> <br />(Mechanical) Blank-off (6) existing zone 11/12 supply gdlles in walls on grids 5/6 while maintaining <br /> (2) active supply gdlles immediately east of gdd C. Do not remove existing VAV units. Adjust <br /> dampers to limit flow at maximum stat signal to 200 cfm from each gdlle. Set VAV-2 maximum <br /> cfm to 600 cfm and adjust associated supply diffusers to 300 cfm. Relocate existing zone 11112 <br /> t-stat to north face of column C6. <br /> <br />$ 3.oo - <br /> <br />$859.00 <br /> <br />~/,'~ $485.00 <br /> <br />(Mechanical) .F&I and_paint (2) 17 (~diator cover extensions (due to wall demo). <br /> ............................................... , · <br />(Mechanical) Relocate (3) existing thermostats due to wail demolition in phase 1 & 2. (-- ~.,,",~,~-,~ / ~ - .~ <br /> <br /> · ~' -'_5 <br />(Electrical) Change existing emergency light in room 120 to a combination emerg.lexit light. ~ $132. <br /> <br />10. (Electrical) Relocate clock outlet ¢__. phase 1 demo wall. Obj~¢--¢-- <br /> <br />11. (Electrical) F&I (1) additional circuit for 2nd floor lighting. <br /> <br />12, (Electrical) F&I (1)lighting contactor for lighting in rooms #203/204. <br /> <br />$213.00 <br /> <br />$696.00 <br /> <br />Business 952-461-3956 <br /> <br />braunbuiltcorp@integraonline.com <br /> <br />Fax 952-461-3958 <br /> <br />Genera/Contracting · Construction Management * Tenant Improv-el~ents <br /> <br /> <br />