Laserfiche WebLink
I <br />I <br />I <br /> <br />PROPOSAL OWNER _X_ <br />REQUEST ~ ARCHITECT X <br /> CONTRACTOR _X_ <br /> FIELD <br /> OTHER <br /> <br />AIA DOCUMENT G709 <br /> <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS <br /> <br />I <br /> <br />COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING <br />DOCUMENT D401, <br /> <br />I <br />I <br />I <br /> <br />PROJECT: <br /> <br />OWNER: <br /> <br />TO CONTRACTOR: <br /> <br />Renovation of the existing <br />Ramsey City Hall <br />15153 Nowthen Blvd. <br />Ramsey MN 55303 <br />City of Ramsey <br />15153 Nowthen Blvd. <br />Ramsey MN 55303 <br /> <br />Braun Built Corporation <br />P.O. Box 1304 <br />Burnsville, MN 55337 <br /> <br />PROPOSAL REQUEST NO.:: <br /> <br />DATE OF ISSUANCE: <br /> <br />CONTRACT FOR: <br /> <br />CONTRACT DATED: <br /> <br />ARCHITECT'S PROJECT #: <br /> <br />ARCHITECT <br /> <br />THREE (3) <br /> <br />August 12, 2002 <br /> <br />Remodel of City. Hall <br /> <br />June 19, 2002 <br /> <br />1272.03 <br /> <br />Boarman Kro6s Vogel Group <br />222 N. 2nd Street <br />Minneapolis, MN 55401 <br /> <br />Please submit an itemized quotation for changes in the Contract Sum and Contract Time for proposed modifications to <br />the Contract Documents described herein. Submit proposal within (# of days) days, or notify Architect in writing of the <br />date on which you anticipate submitting your proposal. <br /> <br />THIS IS NOT A CHANGE ORDER, CONSTRUCTION DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK <br />DESCRIBED IN THE PROPOSED MODIFICATIONS. <br /> <br />DESCRIPTION OF THE WORK: <br />Miscellaneous items requested by the owner to correct previous conditions. <br />ATTACHMENTS: None. <br />Architectural <br /> 1. Service Counter. (employee side) The left unit to have ¼" adjustable shelving with dividers at the center, shelf depth to be <br /> 18" max. Right unit, add two pencil draws approximately 2 ½" deep with a 3-4" fi'ont, match casework color and one %" <br /> full depth adjustable shelf. <br /> 2. Construct enclosures for relocated unit heaters on second floor to 42" finished height versus full height walls. Install a 12". <br /> wide x length of wall P-lam top. P-lam to match upper service counter height and color. <br />Mechanical <br /> 1. On 2/M1.1, blank-off six existing zone 11,12 supply grilles in walls on grids 5 and 6 while maintaining or restoring <br /> two active supply grilles immediately east of grid C. Do not remove existing VAV motorized dampers. Adjust <br /> dampers to limit flow at maximum stat signal to 200 cfm from each grille. Set VAV-2 maximum cfm to 600 cfm <br /> and adjust associated supply diffusers to 300 cfm each. Move existing zone 11, 12 thermostat to north face of <br /> column C6. <br /> 2. On 2/M1.1 ,move existing zone 2,3 thermostat from west wall of room 208 to west wall of room 209, near existing <br /> light switch. <br /> 3. On 2/M1.1 ,move existing zone 7,8 thermostat from west wall of room 204 to south wall near room exit door. <br /> 4. On 2/M1.1 ,move existing zone 9 thermostat from east wall of room 203 to south wall of near room south east exit <br /> door. <br />Electrical <br /> <br />Room 120: Change existing "Emergency Fixture" on south wall to a combination Emergency/Exit light. <br />Emergency to be connected to circuitry serving Room 120 and Exit shall be connected to nearest Exit circuit. <br />Field verify exact conditions. <br /> <br />REQUESTED BY: OWNER <br /> <br />-133- <br /> <br /> <br />