Laserfiche WebLink
STATEMENT OF WORK CERTIFIED <br /> <br /> ~ OF MIN~ESOTA - DEPA~TMENT OF TRA~SPORTATiON <br /> <br />MA_IN BODY iTEMS (Group Level Detail) <br /> <br /> Voucher No. 1! Sheet No: <br /> <br /> I~m Con~rac~ Uni~ Con~rac~ Con~rac~ To Da~e To Daae Grp Line <br /> Number Item Uni5 Price Quanti~y ~oun~ Quan~i~y ~oun~ <br /> <br />2104.509 REMOVE SiGN ~CH 14.00 15.00 210.00 15.00 210.00 003 0~70 <br /> <br /> To,als ~or Proposal Linm Number 0270 90.00 $%,260.00 99.00 $1,386.00 <br /> <br />210~.51! ~A;~ING CONCRETE PAVEMENT {F~L M 16.50 5.00 82.50 1.00 16.50 00l 0280 <br />2104.511 SAWIN~ CONCRETE PAVEMENT (F~L M 16.50 2.00 33.00 0.00 0.00 003 0280 <br /> <br /> Tonals for Proposal Line Nu~er 0280 7.00 $115.50 1.00 <br /> <br />................................................................... <br /> <br />2104.5t3 SAWING BIT PAVEMENT (FULL DEPTH) M <br />2104.512 SAWING BiT PAVEMENT (FULL DEPTH) M <br />2104.513 SAWING BiT PAVEMENT {FULL DEPTH; M <br />2104.51~ SAWING BIT PAVEMENT (FULL DEPTH) M <br />Togal$ for Proposal Line Number 0290 <br /> <br />9.85 389.00 3,831~65 314.60 3,098.81.001 0290 <br /> <br />9.85 41.00 403.85 1~.00 128.05 003 0290 <br />9.85 77.00 758.45 0.00 0.00 005 0290 <br />9.85 405.00 3,989.25 100.00 985.00 007 0290 <br /> 912.00 $8,983.20 427.60 $4,211.86 <br /> <br />2104.523 SALVAGE SIGN TYPE C EACH [4.00 5.00 70.00 4.00 58.00 001 0300 <br /> <br /> To,als (or Proposal Line Number 0300 5.00 $70.00 4.00 $56.00 <br /> <br />2104.523 SALVAGE SIGN TYPE D EACH 20.00 3.00 60.00 2.00 40.00 001 0310 <br /> <br /> To~a~s for Proposal Line Number 0310 3.00 $60.00 2.00 $40.00 <br /> <br />2104.525 7LBJ~NDON & SEAL WELL S~AFT EACH 1,600.00 t3.00 20,800.00 19.00 30,400.00 001 0320 <br /> <br /> Togals tot Proposal Line Number 0320 13.00 $20,800.00 19.00 $30,400,00 <br /> <br />2105.S01 CObb, ON EI{~VATION (P) Mg ~.92 39,517.00 ~54,906.64 4~,2fi7.00 161,766.64 001.0330 <br />2105.501 CO~ON EXCAVATION (P) M3 3.92 12,175'.00 47,726.00 12,175.00 47,726.00 003 0330 <br />2105.501 COM~dON EXCAVATION (P) M3 3.92 2,886.00- 11,313.12 3,010.00 11,799.20 005 0330 <br /> <br /> Togals for Proposal Line Number 0330 54,578.00 $2!3,945.76 56,452.00 $221,291.84 <br /> <br />2105.505 b~JCK EXCAVATION M3 4.25 6,940.00 29,495.00 7,870.00 33,447.50 001 0340 <br /> <br />2105.505 ~JCK EXCAVATION M3 4.25 796.00 3,383.00 1,016.00 4,318.00 005 034.0 <br /> <br /> Togals for Proposal Line Number 0340 7,736.00 $32,878.00 8,886.00 $37,765.50 <br /> <br />2105.507 SUBGR~IDE EXCAVATION M3 3.92 31,420.00 123,166.40 32,467.00 127,270.64 001 0350 <br />2105.507 SLr~GR3kDE EXCAVATION M3 3.92 2,287.00 8,965.04 2,287.00 8,965.04 003 0350 <br />2205.507 SU~G~-ADE EXCAVATION M3 3.92 561.00 2,199.12 561.00 2,199.12 005 0350 <br /> <br /> To,als ~or Proposal Line Number 0350 34,268.00 $13~,330.$6 35,315.00 $138,434.80 <br /> <br />2105.522 SELECT GR3~ BORROW {LV) M3 5.77 28,310.00 165,656.70 18,726.00' 108,049.02 001 03~0 <br />2105.522 SELECT GR3d~ULA_R BORROW (LV) M3 5.77 3,359.00' 19,381.43 !,711.00 9,872.47 0~3 0360. <br />2105.522 SELECT GRLHqvJk~R BORROW (LV) M3 5.77 2,563.00 14,788.51 0.00 0.00 005 0360 <br /> <br />LOW S.P. ~rU~BER 199-010-03 <br /> <br />FOR WORK COMPLETED AS OF 08/12/2002 <br /> <br />Contract Number: E00516 <br /> <br />I <br />I <br />I <br />I <br /> <br />-170- I <br /> <br /> <br />