Laserfiche WebLink
Councilmember Hendriksen imroduced the following resolution and mt,, ed for-its adoption: <br /> <br />RESOLUTION #01-10-383 <br /> <br />A RESOLUTION APPROVING THE ISSUANCE OF A CONDITIONAL USE PERMIT <br />FOR THE INSTALLATION AND OPERATION OF A CELLULAR ANTENNA <br />SYSTEM ON CITY OWNED PROPERTY AND DECLARING TERMS OF SAME <br /> <br /> WHEREAS, Verizon Wireless has properly applied for a conditional use permit to install <br />and operate a cellular antenna system on the City Water Tower #2 on City owned property <br />legally described as follows: <br /> <br />Outlot B, AEC ENERGY PARK, ANOKA COUNTY, MINNESOTA <br />("Site") <br /> <br /> WHEREAS, the Planning Commission met on August 7, 2001, conducted the public <br />hearing and recommended City Council approval of the request. <br /> <br /> NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE <br />CITY OF RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br /> <br />Based on Findings of Fact #0579, a conditional use permit (Permit) for the installation <br />and operation of a cellular antenna system located on the City Water Tower #2 on City <br />owned property is hereby granted to Verizon Wireless, hereinafter referred to as <br />"Permit-tee". <br /> <br />This Permit shall remain in effect until August 31, 2026 as long as the conditions <br />imposed herein are complied with and so long as the Permit-tee, as Lessee has a valid <br />Lease in place with the City as Lessor for lease of the necessary property on the City's <br />water tower and related mezzanine area for the operation of its equipment on the site. <br />However, the Permittee shall have the option for a maximum of four (4) 5-year renewals, <br />resulting in a total permit per/od of up to twenty-five (25).years. The Permittee shall be <br />responsible for submitting a written request for permit renewal at least 30 days prior to <br />expiration of the permit. Said written request shall be submitted to City Council for <br />review and consideration. <br /> <br />All cellular equipment structures will be located inside the water tower on the ground <br />floor and will be encompassed with security fence. Construction and construction <br />methods of all equipment structures within the water tower shall be subject to the review <br />and approval of the City Engineer. <br /> <br />The amount of spaced leased upon the ground floor will be 152 square feet. Any future <br />expansions to the equipment area shall be accommodated on the 2nd floor mezzanine if <br />required to do so by the City. <br /> <br />Upon termination of the Lease and this Permit, the City may order the removal of the <br />antennae and related equipment upon ninety (90) days notice to the Permittee. Further, if <br />there is an interruption of antenna operations for 12 consecutive months, the antenna and <br />related equipment shall be removed from the property. The Permittee shall provide the' <br />City with a letter of credit, performance bond, or another form of security that is <br /> <br />-275- <br /> <br /> <br />